|
|
|
|
|
Marital
Status |
MARRIED |
Date of
Birth |
27.01.1958
mm/dd/yy |
|
Education
(Last Major
Qualification) |
B.E.(INSTRUMENTS
& CONTROL
ENGG.) |
Total Years
of Experience |
22 Yrs + |
|
Nationality |
INDIAN |
Passport
Number |
|
|
Last
Company
ID No.
|
[snip]
16208319 |
Passport
Validity : |
06-11-2018 |
Address for Communication:
|
|
Phone Nos.
E mail
address :
|
|
Joining Time :
|
|
Last Drawn
CTC: |
INR 8.8 LACS. |
Executive Summary
QUALIFICATIONS (Graduation Onwards)
|
|
Qualification |
Institute / University |
Year |
|
1.
|
B.E.(
INSTRUMENT) |
L.D.COLLEGE
OF ENGG.
AHMEDABAD;
GUJRAT UNI. |
1983 |
|
2.
|
F.I.E.;
Ch.E. |
INSTITUTE OF
ENGINNERS(I) – KOLKATTA. |
2007 |
Employment
History (Starting
with Present)
|
|
Company |
Designation |
Period |
|
1 |
[snip] |
SR.MANAGER
(INST.) |
SEPT.2005 TO
APRIL. 2007 |
|
2 |
[snip] |
MANAGER
(INST.) |
APRIL 2005 TO
SEPT.2005. |
|
3 |
[snip] |
DY.MANAGER
(MATERIALS.) |
DEC.2002 TO
APR.2005 |
|
|
|
SR.ENGR(I) UG |
MARCH-1995 TO
DEC.2002 |
|
4 |
[snip] |
SR.ENGR(I)
|
MARCH-1991 TO
MAR.1997 |
|
5 |
[snip] |
MAINT.ENGR(I)
|
APRIL86 TO
MARCH-1991 |
|
6 |
[snip] |
MANAGEMENT
TRAINEE(I.) |
APRIL 1984 TO
APRIL 1986 |
To
carryout feasibility study for various modification scheme,
study of P&ID, , routing of cables, preparation of bill of
material, checklist preparation, cost estimate for field ,
control room items , design of control valve & flow elements
using software INSTRUCAL ; preparation of tender& schedule of
rates, bid evaluation, review & approval of design submitted by
vendor, technical comments of offer received, site supervision
during erection ,trouble shooting during commissioning etc.
Preparation of SOP & SMP for instrumentation Items.
SAP Implementation, Experience & Knowledge:
SAP–MM Project Implementation Worked as a functional consultant
for SAP–MM Core team member in RIL / IPCL Project & Up keeping
Material master , Streamlining SAP MM Helpdesk operation.
Total Experience: 4+ years. Team Strength: 10.
¶
Lead
Time-“the Sleeping Money”
¶
Uniform
codification across RIL/ IPCL
¶
MRP
Level fixing, based on consumption data , for Consumable Items.
¶
Updating of SOP manuals & simplification of procedures as per
business.
¶
Overall, I am having complete functional configuration of the
Materials cycle.
Details of Professional Experience
(Attach Extra Sheets if
necessary)
1.
Period : 1984 to
1986 Designation : MANAGEMENT
TRAINEE(INST.)
Areas of Responsibilities / Major
Achievements
* Revamping of Instrumentation from Pneumatic Control to PLC
Based Controls for 30 TPH, M/S BHEL Boiler for Integrated
Offsite Plant.
* Prepared SPM(Spare-parts manual) for Instrumentation
Items of, Acrylonitrile / Acrylates , Utiliy &LAB / EO-EG
Plants of IPCL Baroda complex Plants.
* Undertaken Interchangeability study for M/S. TAYLOR make
different Pneumatic Instruments Spare-parts used in IPCL
Baroda complex Plants.
* Indigenisation of consumable spares for Pneumatic
Instruments of M/S TAYLOR, M/S I.L. used in Baroda Complex
plants.
2.
Period : 1986 to
1991 Designation : MAINTENANCE ENGINEER
(INST.)
Areas of Responsibilities / Major
Achievements
1.Implementation of Methane Ballast
Scheme for Capacity enhancement of Ethylene Oxide Plant.
2.Daily/Routene & Shut-down Maintenances
of Ethylene Oxide / Etylene Glycol Plant related
Instrumentation.
3.Job Planning for forced / Annual
Shutdowns for EO-EG / LAB Plants.
4.Supervising 20 Technicians for
maintenances activity of running plants.
5.On line Analyzers / Gas Chromatograph
Maintenances / Spare-parts management for all
instrumentation items , consumables.
6.Up grading important control loops from
Pneumatic to Electronic Microprocessors based Controls.
7.Preparing Bill of Materials, Indenting
required items, Technical Evaluation of vendor’s bids ,
Scheduling jobs, Wiring diagram , Installations /
Commissioning Instruments for modification / capacity
Enhancements schemes. Total @ 18 Schemes handled during
period. (COST @ Rs. 25 Millions)
3. Period : 1991 to 2002
Designation :SR. MAINT.ENGINEER(INST.) & SME(UG)
Areas of Responsibilities / Major
Achievements
1.LAB Plant Capacity Enhancement & Conversion
of Control System from Pneumatic to Supervisory DCS Controls
of M/S ABB , MOD-300. PACOL Heater fire incident, Replacements
of total control system cabling , planning and executing total
job in time. Cost :Rs. 35 Millions
3. Detailed engineering for Replacement of
On-line Oxygen and Etylene Analyzers. Cost :Rs. 3.5 Millions
4. Preparations of Bill of material, Cost
Estimate Preparation of Technical specifications, Loop
schematics and Tender document for instrumentation revamp
schemes.
5.Evaluation and scrutiny of Technical bids
and awarding the work contract.
6.Spare parts manual preparation & shut down
jobs planning for LAB / EO-EG Plants.
6.Assisting plant in trouble shooting of
critical problems by providing technical expertise, in solving
chronic maintenances related issues.
7. Revamping of Temperature control System of
Dry Spun Acrylic Fibre (DSAF) Plant, from discrete component
based to Siemens S-150H PLC System.
8. Associated in critical exercise to Make /
ensure all the process control systems and microprocessor based
instrumentation Y2K Compliant / Y2K readiness of all the plants
in all the three complex of IPCL ( Baroda, Gandhar & Nagothane )
9. History maintaining for, Running Plants
critical equipments & their chronic / repetitive nature jobs are
handled to cut down maintenance cost.
10. Worked with all types of process control
instruments ( flow, pressure, temp., level ,on line analytical ,
Density, ) of various makes like M/S ABB ,M/s Fisher-Rosemount,
M/s. Fuji, M/s. Honeywell, M/s Yokogawa, M/s Foxboro, M/s
Taylor, M/s Toshiba , etc. ; Programmable Logic controller (PLC)
of M/s Allen Bradley and M/s Siemens, M/s. Bailey, M/s. Omron
makes. Various types on-line analyzers and Gas Chromatographs ,
like M/s Beckman, M/s Servomax , M/s. Foxboro , M/s Yokogawa ,
M/s ABB etc.
Quality control and R & D laboratory
instruments like Gas chromatograph, Spectrophotometer,
Viscometers, pH meters, Conductivity Meters, of M/s
Perkin-Elmer, M/s Carlo-Erba ,M/s Varian, M/s Hach, etc. ; Air
Monitoring system of M/s. Environment S.A. , France. ;
Distributed Control System like ABB MOD-300, Yokogawa
Centum-CS-1000/XL, Honeywell TDC-3000 .
4.
Period : 2002 -
2007 Designation : DY. MGR.(I) , SR.
MANAGER(I)
Areas of Responsibilities / Major
Achievements
SAP –MM Project Implementation
Experience: Performed as a functional consultant for SAP –
MM (4.6 C) implementation at IPCL. Total Exp.: 4+ years.
Team Strength: 10.
Purchase functions in SAP – streamlined
all purchasing procedures.
Exposure of all stores functions in SAP
in areas like engineering, chemicals and catalysts,
packaging, finished goods, cylinders, scraps, tank age
items.
All vital scenarios e.g. sub contract
work, inter site (Plant to Plant) and inter company
inventory transfers of materials, loan transfers, third
party Receipts, Sloc to Sloc, sub-stores receipt, etc.
Implementations of Scrap cycle & related
activities in SAP.
Exposure of entire Bulk chemical cycle &
related activities in SAP.
Maintained vendor master data, material
master data. Performed also in customizing release
conditions and strategies in MM
MRP implementation for better review,
auto indenting & inventory control and monitor. Thus, stream
line processes, increase service levels and reducing costs.
Real time MIS reports generation for both
Purchase & Stores which helps optimizing business
processes.
Permanent faculty of ongoing training of
SAP MM.
In post SAP implementation period,
controlling and monitoring of all the above-mentioned areas
in SAP.
Excellent command on Microsoft
Office–Excel, word, power point.
CMT Codification cell in-charge &
Material master guardian for Baroda Unit.
Overall, I am having complete functional
understanding of the Materials cycle.
|
|
Subject |
Period |
Venue |
|
1 |
Training
Programme on GAS CHROMATOGRAPHY. M/S BECKMAN |
19.8.85 to
31.8.85 |
IPCL – BARODA. |
|
2 |
TAYLOR
Electronic Instruments. |
17.9.85 to
28.8.1985 |
Taylor –
Faridabad. |
|
3 |
Computer
Appreciation Programme. |
18.1.88 to
22.1.1988 |
TATA-UNISYS |
|
4 |
Flow
Instrumentation |
15.2.90 to
16.2.1990 |
Rosemount
(India) |
|
5 |
CENTUM-XL DCS
ENGG & FUNDAMANTALS |
04.12.95 to
15.12.1995 |
YOKOGAWA -BANGLORE |
|
6 |
TDC-3000 DCS
OVERVIEW & SPECIFICTIONS |
01.05.98 to
15.05.1998 |
TATA- HONEYWELL
PUNE |
|
7 |
SIEMENS SIMATIC
S5 PLC H /WIN CC |
05.10.98 to
08.10.98 |
Siemens – nasik |
|
8 |
PLC PROGRAMMING
& APPLICATIONS |
17.1.2000 to
21.1.2000 |
CRISP- BHOPAL
|
|
9 |
Training on ISO
9000 |
2.2.2001 to
3.2.2001 |
PMDI ,IPCL |
|
10 |
SAP – MM Core
Team Training |
02-05-2005 to
24-8-2005. |
RIL- SEWREE |
Awards / Professional Recognition
(Attach Extra Sheets if Necessary)
Research Papers / Publications
(Attach Extra Sheets if Necessary)
1.Jointly prepared Standard Operating Procedures(SOP) of CES ,
User plant test equipments
2.
Jointly prepared Standard Maintenances Procedures(SMP) of CES ,
User plant Instruments of RIL/IPCL.
1. Fellow Member of
Institution of Engineers
2. Life member of
Instrument Society of America (ISA)
3.
Chartered Engineer from Institution of Engineers
(India)
|