1999-2002 Lead Architect – eRaf Data Platform
(HP Consulting)(contract)
Responsible for the
design and delivery of a consolidated Multi Site geographically
dispersed data centre. Platform component responsibilities were
Highly available
storage solution for all operating systems based on multiple HP
E XP512Disk Arrays. Shared storage interconnected by enterprise
class Brocade silkworm 12000, additional edge switching and SAN
geographic interconnect using Brocade Silkworm 3800 and Cisco
DWDM (Deep Wave Division Multiplex).
Design and
implementation of a Highly Available Windows 2000 based data
platform providing high speed file and print utilising advanced
windows clustering technologies.
Developed the data
management for the newly centralised data; this required the
creation and implementation of techniques to control data
growth, archiving and prevention of storage of unauthorised
materials.
Highly available
backup solution based on multi site, backup and restoration.
ADIC AML/J 12000 slot 12 LTO drive managed and controlled by HP
Omniback 4.1 running on clustered HP 9000.
Highly available
database storage solution based on Microsoft SQL server 2000
Enterprise.
Hardware selection
for all defined Windows 2000 server roles. Delivered fully
automated server installation with integrated server hardening.
The design and
implementation of a platform compatible anti virus solution.
Design and
implementation of the nearest print solution; provided
connection to printers closest to the client both hardwired and
wireless.
Nov 98 – Oct
99 Global Roll Out Coordinator, HP Consulting
(contract)
(Deployed the
project throughout South East Asia Pacific and Japan, Taiwan,
China & Hong Kong)
Essentially
project management, required to provide
•
Process and knowledge transfer to local IT personnel
•
Communicate planning guidelines to the local IT Manager
•
Plan the overall local deployment project
•
Help the local IT Manager to plan the local client
deployment, data migration and old mail system shut down
•
Check and accept the plan
•
Act as a resource coordinator if/when the local resources
are not adequate
•
Ensure that the processes work
•
Installation
•
Support
•
Follow reporting and take corrective actions if needed
Architectural
re-design responsibilities for the successful integration of the
final solution to meet the particular requirements for China.
Additionally
provided training for the project, Exchange based along with
specialization for the software solution devised for the project
Created client
deployment kits for Japanese, Korean and Traditional Chinese
operating systems. Automated the software installation for all
clients including English reducing the install time.
June 98 – Oct
99 Maintenance & Operations Team Leader, Hewlett
Packard Consulting (contract)
Responsible for the
design and delivery of systems management platform for a large
messaging system.
Resource scheduling
and time management along with technical responsibilies for
Backup, Restoration, and Disaster Recovery.
Required to manage
quality of team produced technical documentation, maintain time
schedule for the delivery of final documentation.
Provide direct
support to team members throughout the project life cycle and
ensure that client expectations were met.
Jan 95 - May
98 Senior Systems Analyst, Jones Lang Wootton
(permanent)
Responsible for
network infrastructure development and deployment. Managed
corporate email system and responsible for the migration to
Microsoft Exchange. Technically responsible for 3rd
tier support personnel. |