Curriculum Vitae
Personal
Name
Date of Birth
13th December 1981
Marital Status
Never Married
Residence
Khambhat (Gujarat)
Nationality
Indian
Health
Excellent
Hobbies
Reading, Net surfing, Food & Movies
Contact
Education/Qualification
2004
B.E. Civil Engineering
(Dharmsinh Desai Institute of Technology)
1999
12th Std – Higher Secondary Education
(Shree S.Z. Waghela High School)
1997
10th Std – Secondary Education
(Shree S.Z. Waghela High School)
Training
2006
Quantity Surveying
2005
Introduction to Auto CAD 2004
2004
Graduate Engineer Training
2003
Surveying, Levelling & Tacheometry
2003
Industrial Project Training – Liquid Retaining Structures
2003
Introduction to STAAD & Auto CAD 2000
Computer Knowledge
MS Word, Excel and Auto CAD
Achievements
¨
Awarded as the Employee of the month Nov’ 2004 for best
performance in [snip].
Academic Awards
¨
5th Rank in Civil Engineering in college based on Aggregate
Percentage (62.41%) at the end of 8 Semesters with University
Rank 3rd, 2nd, 7th and 4th in the 2nd, 4th, 5th and 7th Semester
respectively
¨
2nd Rank for having highest marks in Maths in S.S.C.-’97
Over-view
Technology Focus
Ø
Field Related Activities:
¨
General Construction work like Earth-work, Footings, Beams,
Columns, Slabs, etc….
¨
Special Construction jobs like Machine Foundations, etc….
¨
Finishing works like Flooring (Trimix, VDF, Kota Stone and
Screading), Brick-work, Hollow-block work, Plaster-work, Plaster
of Paris (P.O.P),
¨
Special Construction jobs like Effluent Treatment Plant (ETP)
which contains units like Equalization Tank, Aeration Tank,
Primary Clarriflocculator, Pump-House, R.O. Shed, Pump
Foundations, Blower sheds, Cooling Tower, etc….
¨
Construction of Multi-storied buildings
¨
Construction of Resorts
Ø
Office-work Related Activities:
¨
Quantifications, Preparation of BOQ, BOM, & MTO
¨
Computation & Calculations of data available from sites
¨
Co-ordination with site engineers and supervisors
¨
Preparation of running amount bills (RA Bills)of contractors and
sub-contractors
¨
Preparation of Bar Bending Schedules (BBS)
¨
Preparation of daily progress report (DPR)
¨
Preparation of labour reports (LR)
Professional Experience
PROJECT - I
Employer
[snip]
Location
Designation
Quantity Surveyor
Duration
April 2007 – to – Till date
Project
Atlantis – The Palm Hotel
Project Location
The Palm – Jumeirah, Dubai (U.A.E.)
Client
[snip]
Period
April 2007 – Present
Employment Type
Permanent Basis
Recruitment
Through Job Portal
Responsibilities
Ø
Key Responsibilities:
¨
Pre-Tender Quantification
¨
Post-Tender Quantification
¨
Preparation of Bill Of Quantities (BOQ)
¨
Preparation of Bill Of Materials (BOM)
Ø
Secondary Responsibilities:
¨
Co-ordination with site engineers & supervisors for the work and
the work-progress
¨
Preparation of Work-schedules on micro-level
¨
Preparation of Material Take-Off (MTO)
PROJECT - II
Employer
[snip]
Location
Male’ (Republic of Maldives)
Designation
Quantity Surveyor (QS-PROJECTS)
Duration
October 2006 – to – March 2007
Project
Proposed Resort at KONOTTAA Island
Project Location
KONOTTAA Island, Republic of Maldives
Client
Crystal Lagoon Resorts Private Limited
Period
October 2006 – March 2007
Employment Type
Contract Basis
Recruitment
Through Job Portal
Responsibilities
Ø
Key Responsibilities:
¨
Preparation of Quantification
¨
Preparation of BILL OF QUANTITIES (BOQ)
¨
Preparation of BILL OF Materials (BOM)
¨
Preliminary Quantification for Tendering
Ø
Secondary Responsibilities:
¨
Co-ordination with site engineers & supervisors for the work and
the work-progress
¨
Preparation of Work-schedules on micro-level
¨
Preparation of Material Take-Off (MTO)
PROJECT – III
Employer
[snip]
Location
Vadodara, Gujarat (India)
Designation
Project Engineer (Construction)
Duration
March 2006 – to – September 2006
Project
Proposed Zero-Discharge ETP Plant
Project Location
Bhilad-Vapi, Gujarat. (India)
Client
Gujarat Heavy Chemicals Limited
Period
March 2006 – September 2006
Employment Type
Permanent
Recruitment
Personal (Friend)
Responsibilities
Ø
Key Responsibilities:
¨
Construction of water retaining structures and units of ETP like
Equalization Tank, Aeration Tank, Primary Clarriflocculator,
Pump-House, R.O. Shed, Pump Foundations, Blower sheds, Cooling
Tower, etc….
¨
Co-ordination with all departments like construction,
Mechanical, Procurement, Electrical, Projects, Instrumentation,
Process and Design for the construction requirements and details
as it’s a TURN-KEY Project
¨
Responsible for all the activities related to Construction
Ø
Secondary Responsibilities:
¨
Co-ordination with Client as it is a BOOT based Project
¨
Preparation of Quantifications
¨
Preparation of BILL OF QUANTITIES (BOQ), BILL OF Materials (BOM)
and Material Take-Off (MTO)
¨
Preparation of Work-schedules on micro-level
¨
Preparation of contractor’s weekly Bill
¨
Preparation of Daily Progress Report (DPR) & Labour Report (LR)
PROJECT – IV
Employer
[snip]
Location
Ahmedabad, Gujarat (India)
Designation
Junior Engineer (J.E.)
Duration
May 2004 – March 2006
Project
Proposed Delhi Metro Railway Station
Project Location
Delhi. (India)
Client
Delhi Metro Railway Corporation
Period
November 2005 – March 2006
Employment Type
Permanent Basis
Recruitment
Continuing
Responsibilities
Ø
Key Responsibilities:
¨
Construction of general building work like Footings, Beams,
Columns, Slabs, Drainage Gutter, etc….
Ø
Secondary Responsibilities:
¨
Finishing work like brick/block work, plaster work, Plaster Of
Paris (P.O.P), Textured Painting work, etc…..
¨
Flooring (Kota stone, Granite & Tactile), Tilling and Water
proofing.
¨
Handing Over to Client & Maintenance Work.
¨
Preparation of Daily Progress Report (DPR) & Labour Report (LR)
¨
Preparation of sub-contractor’s monthly Running Amount Bill
(RA-Bill)
PROJECT – V
Employer
[snip]
Location
Ahmedabad, Gujarat (India)
Designation
Graduate Engineer Trainee (G.E.T.)
Duration
May 2004 – March 2006
Project
Proposed Pipe Plant at WELS
Project Location
Anjar, Gujarat. (India)
Client
Welspun Gujarat Stahl Rohren (I) Limited
Period
April 2004 – November 2005
Position
Graduate Engineer trainee (G.E.T.)
Employment Type
Permanent Basis
Recruitment
On-Campus Selection
Responsibilities
Ø
Key Responsibilities:
¨
Construction of general building units like Footings, Pedestals,
Ground Beams, Plinth Beams, Stub Columns, Columns, Floorings,
etc...
¨
Construction of Special Foundations (Machine Foundations)
providing the base for machineries (Cross-seam Ultrasonic,
Ultrasonic Wagon, X-Ray Boom-I & II, Conveyors, Skids, KIKO,
Out-Side Welding, Pipe Vacuum Clean-Out, etc...) as per the
drawings issued by the Client
Ø
Secondary Responsibilities:
¨
Preparation of running amount Bills (RA Bills) of
Sub-Contractors.
¨
Preparation of Bar Bending Schedules (BBS) and Quantification of
the proposed works.
|