  Please note that you will need to register with us before direct contact with any candidate can be arranged. This is to protect both the candidate's privacy and yours. Registration is free and without obligation. We are registered under the data protection act and the data we hold is for our own internal use only, we do not share this data with anyone outside of ITCD unless required to do so by law.
 
PROFESSIONAL PRACTICES

Project Planner /Scheduler - [snip]
- Work Location : Erbil, Iraq
- 11 December 2006- Present

Summary of Job Specification
- Prepare ,coordinate and submit Cost Performance Report ( CPR )
- Develop WBS Dictionary, Develop and manage Project Baselines (Schedule and Cost )
- Prepare Cost Control documents, such as cash flow forecast, S-Curves & Histograms, change orders payment schedules and cost comparison calculations.
- Prepare and organize historical cost data into different formats.
- Communicate with project Team members responsible for Progress and cost accumulation.
- Develop formats for information transfer; Labor, equipments, materials, subcontracts and other Direct costs.
- Work with Project Manager to document Physical percent complete and estimate to complete (ETC) projections. perform variances analyses.
- Develop and implement Schedule and cost recovery plans
- Prepare Earned Value Analyses and reports ( EVMS )

Projects Undertaken:
- Task Order No .12 Northwest Police Station ( $28Million)
- Task Order No. 32 Iraqi Army 2nd and 4th Division Facilities ( $ 88 Million )
- Task Order No. 34 Northern Police Stations ( 13.9 Million )
- Task Order No. 19 Kirkuk Air Base ($ 5Million )
- Task Order No. 25 Diyala Iraqi Police Stations ( $ 10Million)
- Task Order No. 36 4th Division K-1, Phase III & IV ( $ 34 Million )

Project Planner -

[snip]

- 12 February 2005 – 8 December 2006

Summary of Job Specification
[snip] has expanded its steel making facilities in 2003 and I was hired in Manila to be one of the project team. I was hired as a Project Planner and I was a member in drafting our organizational structure and team development for Project Management of the 1.5B US$ multi steel manufacturing facility. At the onset of the project, I have to develop all preliminary schedules of the five (5) mega projects i.e., from Inquiry phase to complete start- up of these facilities. These include the drafting of the Engineering study, the Procurement phase, and the Construction up to Final Acceptance of the projects. As the Owner of the projects, we acted as the Project Manager and hired different consultants for the studies and viabilities of these projects. As a member of the Project Management Team, it is my duty to inform all parties about everything of the projects be it commercial, technical and other relative coordination works since our contractors are out-of-kingdom based. I also perform thorough analysis of Construction Budget in relation to construction schedule by discipline and formulating project progress measurements (EVA) and invoicing procedures. I am also tasked in preparing cash-flow (s-curve) for the entire duration of the project, Monthly Project Progress Report and Executive Management Report. It is my duty to initiate, plan, execute, control, and close all relevant activities which a project is involved in.
As a summary my whole responsibility is ensuring that the project includes all the work required, and only the work required to complete the project successfully, ensuring timely completion of the project consisting of activity definition, activity sequencing, activity duration estimating, schedule development, and schedule control, ensuring that the project is completed within the approved budget consisting of resource planning, cost estimating, cost budgeting, and cost control, and ensuring that the project will satisfy the needs for which it was undertaken, and ensuring stakeholders differing needs and expectations.
- Maintain an ongoing analysis of the performance of the Contractor’s activities in relation to the project Schedules, to report all variances, forecast consequences and recommend strategies for remedial action.
- Defining the physical progress of Site activities at any required times using EARNED VALUE MANAGEMENT(EVA), especially in relation to periodical progress reports and preparation of payments invoice certificates.
- Preparing Monthly Progress Report for all Contracts related to HADEED Expansion projects.
- Prepare Cost Control documents, such as cash flow forecast, S-Curves & Histograms, change orders payment schedules and cost comparison calculations.
- In-charge in the implementation / Doumentation of Plant Acceptance / Project Close out procedure , System Handling of Punch lists / deficiencies by developing a systematic and comprehensive database checklist during Mechanical Completion inspections, Commissioning, Functional Tests, Startup and PG test of the plant as per Technical Contract Specifications. Prepares all close out documentation up to Final Acceptance of the Plant.

Projects Undertaken:
[snip] Expansion Projects : $ 1.5 Billion
- Wire Rod and Rebar Mill 500,000 tpy -Danieli EC & Dywidag SA
- Hot Mill Enhancement Projects 1,000,000 tpy -VAISiemens / SMS & Saudi Voest Alpine
- Steel Plant / Caster Plant 1,220,000 tpy - VAISiemens / SMS & Saudi Voest Alpine
- Cold Galvanizing Line 240,000 tpy - VAISiemens / SMS & Saudi Voest Alpine
- New Main Sub-Station 235 MW - Siemens AG & Siemens KSA
- Colour Coating Line 120,000 tpy -Posco E&C / Daewoo E&C / Dywidag SA
- Workshop Expansion -Kamco
- Direct Reduced Iron Plant 1.76 Million tpy - VAISiemens/Midrex USA/SVA

Project Manager / Planning Engineer - PRIVATE PRACTICE
Philippines

Summary of Job Specification
Develop Project Master Schedule comprise of effective Project management and methodologies for application on each scope , WBS, cost , procurement, Quality manpower loading, and integration. Using MS Project 2003 / Primavera 3.1 for Project control progress and performance are analyze using EARNED VALUE METHOD and Innovative EARNED SCHEDULE analysis. Develop and evaluate project cash flow based on agreed contract amount distribution and monitor cost curves/histogram periodically. And prepare project progress billing and invoices and progress weekly/monthly reports .Monitor and track the so called “ Triple threat “ schedule, time and cost and daily construction events and analyze construction methodology resulting to delays to prepare corrective action plans.

Projects Undertaken:
- ALTO Housing / Subdivision
Norzagaray , Bulacan , Philippines
24 units of Single Detached Houses
- ENGR. ROSAS Residence
Cavite , Philippines
High End 2-Storey Residential Building: 12 Million Peso Project
- KASIGLAHAN National High School
Rodriguez, Rizal , Philippines
School Buildings

Project / Planning Engineer - [snip]
Philippines
- 15 January 2003 – 30 January 2004

Summary of Job Specification
- Prepare Bid Estimates and Pre-Qualification
- Develop Working Time Schedules using MS Project 2003 and Primavera P3
- Estimate and allocate Resource –Manpower loading .
- Supervise site personnel and monitor the on going project to make sure that it adheres to plans, time schedule, and Technical specifications.
- Coordinate with the Procurement personnel ensuring timely delivery of materials.
- Assess Project Achievement /Accomplishments using Earned Value Management
- Analyze Project Actual Accomplishments, Cost Performance, Schedule variances and S-Curves
- Provide course of corrective actions and recommendations
- Prepare Progress Billing and Invoices

Projects Undertaken :
- Monique Ignacio Agatep Residence
Ayala Heights Subdivision, Quezon City
High End Residential Building – Project Cost : 24 Million Peso
- Mc Donald Fast Food Restaurant –Quezon Avenue Branch
Quezon Blvd. , Edsa , Quezon City, Philippines
- Mercury Drug Store –Farmers Cubao Branch
Cubao ,Quezon City, Philippines
- Mercury Drug Store –Delta Branch
Delta, Quezon Ave. QC , Philippines

- [snip] Planning Engineer  - Philippines
- 11 July 1997 – 28 December , 2003

Summary of Job Specification
- Prepare Bid Estimates and Pre-Qualification requirements
- Develop Working Time Schedules using MS Project 2003 and Primavera P3
- Coordinate with the Procurement personnel ensuring timely delivery of materials.
- Assess Project Achievement /Accomplishments using Earned Value Management,S-Curves, Resources Profiles and Histograms.
- Analyze Project Actual Accomplishments, Cost Performance, Schedule variances and
- Provide course of corrective actions and recommendations
- Prepare Progress Billing and Invoices and weekly/monthly reports.
- Assess variation proposals and change orders.

Projects Undertaken :
- Department of Education
Ultra, Pasig, Philippines
Government of the Philippines
Foreign Assisted Projects-ADB,USAID,JICA
Department of Education Division Office - 5 Storey Office Building located at Iloilo City
Construction of various school building in the entire Western Visaya Region 6,Philippines
- Department of Public Works and Highways-Iloilo Province
Regional 6 , Western Visayas
Government Infrastructure Projects / Foreign Fund Projects/ World Bank Loan
Farm to Market Roads, Various School Bldgs., Sports Complex, Multi-Purpose Halls and Buildings, Government Offices, Historical Bldgs. And Landmarks.
- DECS Hostel
Balabag , Boracay Island , Aklan, Philippines
Department of Education Hotel – Boracay Island , Aklan, Philippines 

T R A I N I N G S

Description

Venue

Duration

Civil Engineering Software

Use of Computers in Civil Engineering

NATIONAL IRRIGATION ADMINISTRATION

        5TH Floor NIA, EDSA, Quezon City, Philippines

       

19-20 May, 2000

 

AutoCAD Rel. 14 with Color Rendering

Autodesk Training Center

Micro CADD Technologies Co.

        Aurora Blvd., Cubao, Quezon City, Philippines

09 Jan-19 Mar, 2000

STAAD III ver. 22.3

Computer-Aided Struc’l Analysis & Design

Micro CADD Technologies Co.

        Aurora Blvd., Cubao, Quezon City, Philippines

 

12 Dec- 13 Feb, 2000

MS Project 2003

Dynamic Project Planning & Scheduling

Micro CADD Technologies Co.

        Aurora Blvd., Cubao, Quezon City, Philippines

 

5 Jan- 28 Mar, 1999

Applied Technologies in Construction

PICE-LNM Continuing Professional Education Program

University of Sto. Tomas- UST Auditorium

        España, Manila , Philippines

 

17-18 July,1998

PRIMAVERA  P3- ver. 3.1

Computer –Aided Construction Project Management

CAD Vision Engineering Technologies

        C.M. Recto, Manila, Philippines

 

01 May-30 June, 1998

Seminar on Structural Design

Civil / Structural Design, ACI

Bulacan State University- BSU, Integrated Bldg,

        City of Malolos, Bulacan, Philippines

 

19 Feb, 1997

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

  

S U M M A R Y   O F   E X P E R T I S E

 

     Total Number of years

 

 

10 Years solid experience

 

 

PROJECT PLANNING / SCHEDULING

     MS Project 2003

Earned Value Management- EVA

Primavera Project Planner P3 v 3.1

 

COMPUTER TECHNICAL SUPPORT (SOFTWARE)

     Microsoft Excel

Microsoft Word

Microsoft Power Point

     Microsoft Outlook

 

Adobe Acrobat

 

Computer Aided Engineering Design / Drafting

     Autocadd Rel. 14 / 2000

STAAD

 

 

EDUCATION
Bulacan State University , College of Engineering , City of Malolos ,Bulacan
BSCE Graduate, April 1997
PRC Civil Engineering Licensure Board Examination Rating 85.45 %
MEMBER : Philippine Institute of Civil Engineering , PICE-LNM Chapter


 

 
 
 