PROFESSIONAL PRACTICES
Project Planner /Scheduler - [snip]
- Work Location : Erbil, Iraq
- 11 December 2006- Present
Summary of Job Specification
- Prepare ,coordinate and submit Cost Performance Report ( CPR )
- Develop WBS Dictionary, Develop and manage Project Baselines
(Schedule and Cost )
- Prepare Cost Control documents, such as cash flow forecast,
S-Curves & Histograms, change orders payment schedules and cost
comparison calculations.
- Prepare and organize historical cost data into different
formats.
- Communicate with project Team members responsible for Progress
and cost accumulation.
- Develop formats for information transfer; Labor, equipments,
materials, subcontracts and other Direct costs.
- Work with Project Manager to document Physical percent
complete and estimate to complete (ETC) projections. perform
variances analyses.
- Develop and implement Schedule and cost recovery plans
- Prepare Earned Value Analyses and reports ( EVMS )
Projects Undertaken:
- Task Order No .12 Northwest Police Station ( $28Million)
- Task Order No. 32 Iraqi Army 2nd and 4th Division Facilities (
$ 88 Million )
- Task Order No. 34 Northern Police Stations ( 13.9 Million )
- Task Order No. 19 Kirkuk Air Base ($ 5Million )
- Task Order No. 25 Diyala Iraqi Police Stations ( $ 10Million)
- Task Order No. 36 4th Division K-1, Phase III & IV ( $ 34
Million )
Project Planner -
[snip]
- 12 February 2005 – 8 December 2006
Summary of Job Specification
[snip] has expanded its steel making facilities in 2003 and I
was hired in Manila to be one of the project team. I was hired
as a Project Planner and I was a member in drafting our
organizational structure and team development for Project
Management of the 1.5B US$ multi steel manufacturing facility.
At the onset of the project, I have to develop all preliminary
schedules of the five (5) mega projects i.e., from Inquiry phase
to complete start- up of these facilities. These include the
drafting of the Engineering study, the Procurement phase, and
the Construction up to Final Acceptance of the projects. As the
Owner of the projects, we acted as the Project Manager and hired
different consultants for the studies and viabilities of these
projects. As a member of the Project Management Team, it is my
duty to inform all parties about everything of the projects be
it commercial, technical and other relative coordination works
since our contractors are out-of-kingdom based. I also perform
thorough analysis of Construction Budget in relation to
construction schedule by discipline and formulating project
progress measurements (EVA) and invoicing procedures. I am also
tasked in preparing cash-flow (s-curve) for the entire duration
of the project, Monthly Project Progress Report and Executive
Management Report. It is my duty to initiate, plan, execute,
control, and close all relevant activities which a project is
involved in.
As a summary my whole responsibility is ensuring that the
project includes all the work required, and only the work
required to complete the project successfully, ensuring timely
completion of the project consisting of activity definition,
activity sequencing, activity duration estimating, schedule
development, and schedule control, ensuring that the project is
completed within the approved budget consisting of resource
planning, cost estimating, cost budgeting, and cost control, and
ensuring that the project will satisfy the needs for which it
was undertaken, and ensuring stakeholders differing needs and
expectations.
- Maintain an ongoing analysis of the performance of the
Contractor’s activities in relation to the project Schedules, to
report all variances, forecast consequences and recommend
strategies for remedial action.
- Defining the physical progress of Site activities at any
required times using EARNED VALUE MANAGEMENT(EVA), especially in
relation to periodical progress reports and preparation of
payments invoice certificates.
- Preparing Monthly Progress Report for all Contracts related to
HADEED Expansion projects.
- Prepare Cost Control documents, such as cash flow forecast,
S-Curves & Histograms, change orders payment schedules and cost
comparison calculations.
- In-charge in the implementation / Doumentation of Plant
Acceptance / Project Close out procedure , System Handling of
Punch lists / deficiencies by developing a systematic and
comprehensive database checklist during Mechanical Completion
inspections, Commissioning, Functional Tests, Startup and PG
test of the plant as per Technical Contract Specifications.
Prepares all close out documentation up to Final Acceptance of
the Plant.
Projects Undertaken:
[snip] Expansion Projects : $ 1.5 Billion
- Wire Rod and Rebar Mill 500,000 tpy -Danieli EC & Dywidag SA
- Hot Mill Enhancement Projects 1,000,000 tpy -VAISiemens / SMS
& Saudi Voest Alpine
- Steel Plant / Caster Plant 1,220,000 tpy - VAISiemens / SMS &
Saudi Voest Alpine
- Cold Galvanizing Line 240,000 tpy - VAISiemens / SMS & Saudi
Voest Alpine
- New Main Sub-Station 235 MW - Siemens AG & Siemens KSA
- Colour Coating Line 120,000 tpy -Posco E&C / Daewoo E&C /
Dywidag SA
- Workshop Expansion -Kamco
- Direct Reduced Iron Plant 1.76 Million tpy - VAISiemens/Midrex
USA/SVA
Project Manager / Planning Engineer - PRIVATE PRACTICE
Philippines
Summary of Job Specification
Develop Project Master Schedule comprise of effective Project
management and methodologies for application on each scope , WBS,
cost , procurement, Quality manpower loading, and integration.
Using MS Project 2003 / Primavera 3.1 for Project control
progress and performance are analyze using EARNED VALUE METHOD
and Innovative EARNED SCHEDULE analysis. Develop and evaluate
project cash flow based on agreed contract amount distribution
and monitor cost curves/histogram periodically. And prepare
project progress billing and invoices and progress
weekly/monthly reports .Monitor and track the so called “ Triple
threat “ schedule, time and cost and daily construction events
and analyze construction methodology resulting to delays to
prepare corrective action plans.
Projects Undertaken:
- ALTO Housing / Subdivision
Norzagaray , Bulacan , Philippines
24 units of Single Detached Houses
- ENGR. ROSAS Residence
Cavite , Philippines
High End 2-Storey Residential Building: 12 Million Peso Project
- KASIGLAHAN National High School
Rodriguez, Rizal , Philippines
School Buildings
Project / Planning Engineer - [snip]
Philippines
- 15 January 2003 – 30 January 2004
Summary of Job Specification
- Prepare Bid Estimates and Pre-Qualification
- Develop Working Time Schedules using MS Project 2003 and
Primavera P3
- Estimate and allocate Resource –Manpower loading .
- Supervise site personnel and monitor the on going project to
make sure that it adheres to plans, time schedule, and Technical
specifications.
- Coordinate with the Procurement personnel ensuring timely
delivery of materials.
- Assess Project Achievement /Accomplishments using Earned Value
Management
- Analyze Project Actual Accomplishments, Cost Performance,
Schedule variances and S-Curves
- Provide course of corrective actions and recommendations
- Prepare Progress Billing and Invoices
Projects Undertaken :
- Monique Ignacio Agatep Residence
Ayala Heights Subdivision, Quezon City
High End Residential Building – Project Cost : 24 Million Peso
- Mc Donald Fast Food Restaurant –Quezon Avenue Branch
Quezon Blvd. , Edsa , Quezon City, Philippines
- Mercury Drug Store –Farmers Cubao Branch
Cubao ,Quezon City, Philippines
- Mercury Drug Store –Delta Branch
Delta, Quezon Ave. QC , Philippines
- [snip] Planning Engineer - Philippines
- 11 July 1997 – 28 December , 2003
Summary of Job Specification
- Prepare Bid Estimates and Pre-Qualification requirements
- Develop Working Time Schedules using MS Project 2003 and
Primavera P3
- Coordinate with the Procurement personnel ensuring timely
delivery of materials.
- Assess Project Achievement /Accomplishments using Earned Value
Management,S-Curves, Resources Profiles and Histograms.
- Analyze Project Actual Accomplishments, Cost Performance,
Schedule variances and
- Provide course of corrective actions and recommendations
- Prepare Progress Billing and Invoices and weekly/monthly
reports.
- Assess variation proposals and change orders.
Projects Undertaken :
- Department of Education
Ultra, Pasig, Philippines
Government of the Philippines
Foreign Assisted Projects-ADB,USAID,JICA
Department of Education Division Office - 5 Storey Office
Building located at Iloilo City
Construction of various school building in the entire Western
Visaya Region 6,Philippines
- Department of Public Works and Highways-Iloilo Province
Regional 6 , Western Visayas
Government Infrastructure Projects / Foreign Fund Projects/
World Bank Loan
Farm to Market Roads, Various School Bldgs., Sports Complex,
Multi-Purpose Halls and Buildings, Government Offices,
Historical Bldgs. And Landmarks.
- DECS Hostel
Balabag , Boracay Island , Aklan, Philippines
Department of Education Hotel – Boracay Island , Aklan,
Philippines
T R A I N I N G S
|
Description
|
Venue
|
Duration
|
|
Civil Engineering Software
Use of Computers in Civil Engineering |
NATIONAL IRRIGATION ADMINISTRATION
5TH Floor NIA, EDSA, Quezon City, Philippines
|
19-20 May, 2000
|
|
AutoCAD Rel. 14 with Color Rendering
Autodesk Training Center |
Micro CADD Technologies Co.
Aurora Blvd., Cubao, Quezon City, Philippines |
09 Jan-19 Mar, 2000 |
|
STAAD III ver. 22.3
Computer-Aided Struc’l Analysis & Design |
Micro CADD Technologies Co.
Aurora Blvd., Cubao, Quezon City, Philippines
|
12 Dec- 13 Feb, 2000 |
|
MS Project 2003
Dynamic Project Planning & Scheduling |
Micro CADD Technologies Co.
Aurora Blvd., Cubao, Quezon City, Philippines
|
5 Jan- 28 Mar, 1999 |
|
Applied Technologies in Construction
PICE-LNM Continuing Professional Education Program |
University of Sto. Tomas- UST Auditorium
España, Manila , Philippines
|
17-18 July,1998 |
|
PRIMAVERA P3- ver. 3.1
Computer –Aided Construction Project Management |
CAD Vision Engineering Technologies
C.M. Recto, Manila, Philippines
|
01 May-30 June, 1998 |
|
Seminar on Structural Design
Civil / Structural Design, ACI |
Bulacan State University- BSU, Integrated Bldg,
City of Malolos, Bulacan, Philippines
|
19 Feb, 1997 |
S U M M A R Y O F E X P E R T I S E
|
|
Total Number of years
|
10 Years solid
experience
|
PROJECT PLANNING /
SCHEDULING
|
|
MS
Project 2003 |
Earned Value
Management- EVA |
Primavera
Project Planner P3 v 3.1 |
COMPUTER TECHNICAL
SUPPORT (SOFTWARE)
|
|
Microsoft Excel |
Microsoft
Word |
Microsoft
Power Point |
|
Microsoft Outlook |
|
Adobe
Acrobat |
Computer Aided
Engineering Design / Drafting
|
|
Autocadd Rel. 14 / 2000 |
STAAD
|
|
EDUCATION
Bulacan State University , College of Engineering , City of
Malolos ,Bulacan
BSCE Graduate, April 1997
PRC Civil Engineering Licensure Board Examination Rating 85.45 %
MEMBER : Philippine Institute of Civil Engineering , PICE-LNM
Chapter
|