PROFILE
Experienced
commercially aware ENGINEERING MANAGER with proven record of
achievement within food and pharmaceutical environment.
Positive communicator and motivational team leader whose key
strengths are having an organised, practical and creative
approach to solving operational and technical problems,
resulting in a successful and profitable solution.
KEY SKILLS
¨
Project Management on construction of food manufacturing units.
¨
Design & commissioning of food production systems.
¨
Building Energy Management Systems.
¨
2D – 3D AutoCAD – Excel – Word
KEY CAREER
ACHIEVEMENTS
¨
Managed the construction,
commissioning of the plant and machinery, the setting up of
factory process systems; enabling factory production to proceed
two months ahead of target.
¨
Designed complete specification
for conveyor handling system, its innovative design and
reliability led to repeat orders for new systems, business worth
£200k.
¨
Researched, designed and
installed biological effluent treatment system; received ‘highly
recommended’ accolade from Prince of Wales in the ‘Business in
the Environment Award’.
CAREER
2006 - 2007 [snip]
ENGINEERING - SALES MANAGER
[snip] are
a 50 year old manufactures of chocolate coating machines with a
world wide market, as the Engineering – Sales Manager it was my
role to not only run the factory but to improve the out dated
machines and to make them more marketable.
¨
Redesigned parts of the machine
to improve manufacturing time and found new suppliers for parts
saving 3k per machine.
¨
Looked at the software HMI and
PLC control and made savings of 2k
¨
Set up new Health and Safety
system within the company.
2003 – 2006 [snip] (Europe) Ltd
ENGINEERING DESIGN DIRECTOR
Appointed
Director with brief to manage design, specification and
manufacturing unit. Manufacturer of bespoke stainless steel and
aluminium equipment for food and pharmaceutical industries.
¨
Designed complete specification
for conveyor handling system, its innovative design and
reliability led to repeat orders for new systems; business worth
£200k.
¨
Designed and developed
innovative ‘flapjack cutter machine’ for a cake company giving
20% increase in production capacity, coupled with reliability of
production eliminating previous lost time due to machinery
breakdown. Requested to design new machine to cut flapjacks in
tray, further increasing production by over 20%.
1999 – 2003 [snip], Birmingham
PROJECT & ENGINEERING DESIGN MANAGER
Headhunted to
join this manufacturer and supplier to the food industry with
brief to help market overseas supplier’s equipment and improve
systems within company.
¨
Intensive negotiation with
Australian manufacturer to sell their ‘salad drying machines’
within the UK and act as their agents.
¨
Reduced costs of manufacturing
‘food standard conveying systems’ across the range to cover
different food sectors including salads, chickens, meats, etc.
1993 – 1999 [snip] (UK) Ltd - Wrexham
CHIEF ENGINEER
Headhunted with
brief to construct and set up new factory for this Dutch owned
company in nine months to manufacture and supply frozen meals to
the Airline and retail industry; budget £750k.
¨
Introduced Building Energy
Management and heat recovery systems to factory design saving
10% of annual heating costs.
¨
Negotiations of contracts with
energy suppliers saving £20k costs in first year.
¨
Managed commissioning of the
plant and machinery, setting up of factory process systems and
recruitment of staff and factory in production; accomplished in
eight months, one month ahead of schedule.
¨
Installation of effluent
treatment plant, steam boiler, ammonia refrigeration systems
with associated safety systems incorporated.
1992 – 1993 [snip], Flint
FACTORY ENGINEER
Promoted with
brief to control all aspects of factory engineering in this
£7.5m ready meal factory. Managed seven Engineers.
¨
Researched, designed and
installed biological effluent treatment system received ‘highly
recommended’ accolade in the ‘Business of the Environment Award’
by the Prince of Wales.
¨
Installed £900k ammonia
refrigeration system, complete with alarm installation and
evacuation procedures.
¨
Implemented planned
Preventative Maintenance system reducing breakdowns.
1982 – 1992 [snip]
1988 – 1992 PROJECT ENGINEER – Flint
Relocated to
act as site Project Engineer during construction of new £7.5m
ready meal factory.
¨
Managed commissioning of the
plant and machinery, setting up of factory process systems,
factory in production accomplished in 10 months, two months
ahead of target.
¨
Designed the factory and
systems to meet Ministry of Agriculture, Food and Fisheries
regulations to obtain EEC licence.
1986 – 1988 ASSISTANT PROJECT ENGINEER
– Tunbridge Wells
¨
Project managed £1m upgrade of
factory to meet EEC standards.
1982 – 1986 SHIFT ELECTRICAL ENGINEER –
Tunbridge Wells
1973 – 1982 [snip], Tunbridge Wells
1980 – 1982 SENIOR ELECTRICAL ENGINEER
1978 – 1980 PRINTERS ELECTRICAL
MAINTENANCE ENGINEER
1973 – 1978 PRINTERS ELECTRICAL
MAINTENANCE APPRENTICE
QUALIFICATIONS &
PROFESSIONAL TRAINING
1990 BTEC Certificate in Management Studies
Trent Building
Energy Management Course
First Certificate in Food Safety
City & Guilds Electrical Installations, Parts I & II
PERSONAL DETAILS
Married Clean driving
licence DOB 25/10/1956
|