The following profile is a candidate from IT Consultants Direct "ITCD".
http://www.it-consultants-direct.co.uk/
  This candidate can be contacted via the following link:
mailto:candidates@itcd-group.co.uk?Subject=HA14407S
  The complete ITCD candidate database can be accessed at:
http://www.it-consultants-direct.co.uk/search.html
  Please note that you will need to register with us before direct contact with any candidate can be arranged. This is to protect both the candidate's privacy and yours. Registration is free and without obligation. We are registered under the data protection act and the data we hold is for our own internal use only, we do not share this data with anyone outside of ITCD unless required to do so by law.
 

Objective

To utilize my potential and zest for achieving excellence and apply all that I have learned to be a part of a dynamic team.

Professional Experience

·         On Job Trainings: 

o        April 2006, Indonesia: Hardware Installation of BS-240, BS-241, BS-860 (Node-B) and SRALxD with [snip] Indonesia.

o        March 2006, Pakistan: Successfully completed training of NEC microwave (Pasolink, Pasolink+ and Pasolink Mx) (with 1+0, 1+1, XPIC [2(1+0) and 2(1+1)] configurations) installation & commissioning NEC Pakistan.

o        February 2006, Pakistan: Installation, commissioning & troubleshooting of Traffic Node & Hicap (Technical).Focused on I&C & troubleshooting of Ericsson minilink TN & Hicap. Practical implementation of MSM software tool & web server based solution with [snip] Pakistan.

o        September 2005, Pakistan: Certified training of Quality Control Manager (QCM) which includes quality standards of Hardware Installation of Switching Products, BTS and Power with [snip] 

·        Working as an RAN Supervisor with [snip] Ltd. Pakistan since Nov 06 to Date. 

·        [snip] Project (Phase V) PAKISTAN:

o        Supervision of Installation, Commissioning, Testing and Integration of Ericsson RBS (2206, 2207, 2106 and 2107) in order to make it according to Ericsson Standards.

o        DTF measurements and VSWR Chkecking.

o        Installation and Commissioning of Mini-Link E-Classic and Mini-Link E Traffic Node (2P, 6P and 20P) and Hicap for 18 and 38 GHz Band frequencies.

o        Testing and troubleshooting of all types of Minilink nodes using LCT and MSM.

o        Involved in acceptance of Minilink nodes (Classic, TN & Hicap) and acceptance of Complete Site

o        Coordination between implementation teams, Sub-Contractors teams.

o        Taking care of all Documentation required for the project, Commissioning Reports, BoQs and Acceptance Documents

o        Responsible for generating Material Request Form (MRF).

o        Supervision of complete Indoor & Outdoor installation and logistics problems 

·        Worked as an Implementation Consultant with [snip] INDONESIA Since March 06 to November 06.

·        [snip] (In-Building Coverage) Roll out Project INDONESIA:

o        Supervision of Hardware Installation of Base stations for 2G; DCS (BS 82 II eMicro, BS 288) and 3G; UMTS (Node-B 860).

o       Installation and Commissioning of microwave links using SRT1F, SRA4 and SRALxD.

o       Testing and Integration of microwave links.

o        Technical Site Surveys (TSS) to select appropriate Equipment location, Microwave pole location, GSM (Omni, Directional, and Bi-Directional) Antennas Location to cover optimal intended coverage areas inside each building.

o        Revision of Design Packs (TSSR) for In-Building Solutions which comprised of following Parameters: Link Budgets, Material list, (Feeder, splitter, coupler marking), Antennas Location, Cable routing, intended coverage Area Schematics and Documentation.

o        Environment Acceptance, Indoor Quality Check for designing the In-Building Coverage solution.

o        Line of Sight surveys (LOS) for In-building sites network.

o        As an Implementation Engineer my responsibilities are also to coordinate with the other Network Regional teams, Transmission Planning team, RF planning and Optimization teams, Engineering Operations in Siemens, with Client and with Sub-Contractors.

o        Worked on CAPRI data base for implementation of milestones. 

·         Worked as a Commissioning Engineer with [snip] Pakistan Since April ‘04 to Mar ‘06.

·        [snip] (Phase I, III, IV) PAKISTAN:

o        Supervision of Installation, Commissioning, Testing and Integration of Ericsson RBS (2206, 2207, 2106 and 2107) in order to make it according to Ericsson Standards.

o        DTF measurements and VSWR Chkecking.

o        Installation and Commissioning of Mini-Link E-Classic and Mini-Link E Traffic Node (2P, 6P and 20P) and Hicap for 18 and 38 GHz Band frequencies.

o        Testing and troubleshooting of all types of Minilink nodes using LCT and MSM.

o        Involved in acceptance of Minilink nodes (Classic, TN & Hicap) and acceptance of Complete Site

o        Line of Sight surveys (LOS) and clearance of problems in LOS.

o        Coordination between implementation teams, Sub-Contractors teams.

o        Responsible for generating Material Request Form (MRF).

o        Taking care of all Documentation required for the project, Commissioning Reports, BoQs and Acceptance Documents.

o        Supervision of Indoor & Outdoor installation and logistics problems

o        Track and maintain daily and monthly reports. 

·      [snip] Project (Phase II & III) PAKISTAN:

o        Having Hands on expertise of installation, commissioning and testing of Siemens Surpass hiT 7070 2.1 SC Electrical in Telenor project.

o        Installation, Commissioning, Integration n testing of  BS 240 XL II.

o        Band Expernsion of BTS and Antennas.

o        DTF measurements and VSWR Chkecking.

o        Installation and commissioning of Siemens SMA1k, SRA4, SRALxD.

o        Testing and Acceptance of MW Links with Client.

o        Up-gradation and Expansions of existing links.

o        Co-Channeling of microwave links.

o        Commissioning of microwave links in Siemens-Telenor project and have an experience of working on PDH and SDH links with 1+0, 1+1, 2+0 and 2(1+1) configuration in Multan, Jhang, Okara, Faisalabad, Gujranwala, Lahore region, Sukkur region, Karachi region and Highway Links.

o        Andrew ValuLine Antenna (30cm, 60cm & 120cm).

o        Line of Sight surveys (LOS) for microwave links.

o        Taking care of all Documentation required for this project, Commissioning Reports, BoQs and Acceptance Documents.

o        Worked as Team Lead, supervision of Indoor & Outdoor installation, logistics problems and taking care of every standard as required. 

·        Tools:

o       TNMS CT (Version 3.0)

o       LCT (Version 5.0 & 6.1)

o       Net Builder

o       Mini-Link Manager

o       Hyper Terminal

o       LMT / OMT

o       MapInfo

·        Testing Equipment:

o       Anritsu MP-1570 (Freq. Range: 1.5 Mb/s to 10 Gb/s).

o       Anritsu Site Master S331B

o       Acterna ANT-5.

o       Sunlite E1 Bert.

 

Education

B.E.     Computer Engineering, April 2004

·         National University of Science & Technology (NUST), Rawalpindi, Pakistan.

HSSC (FSc, Pre-Engineering), June 2000

·         Govt. College University (GCU), Lahore Pakistan.

SSC    (Phy, Chem, Bio, Math), May 1998

·         Divisional Public School (DPS), Lahore, Pakistan.

Technical Skills

·         Diploma in MS Office (Word, Excel, Power Point)   (NKFACT, Lahore, Pakistan. 1998)

·         C ++, MATLAB, JAVA, Assembly, Electronic Work Bench

  • Operating Systems:                                                Windows 98, 2000, XP, Linux

 

Languages

·         Fluent in (writing / reading / speaking) English, Bahasa Indonesia, Urdu, Punjabi

·         Basics in French and Arabic.

·         Cultural and Religious awareness  

·         Good collaboration in teamwork and human relation skills, able to work under pressure and independently, self-motivated, responsible, ambitious, fast learner and enthusiastic

 
 
 
© 2004, 2005 Copyright IT Consultants Direct Ltd. All Rights Reserved.