 |
| |
The following profile is a
candidate from ITCD Group "ITCD".
http://www.it-consultants-direct.co.uk/ |
| |
This candidate can be contacted via
the following link:
mailto:candidates@itcd-group.co.uk?Subject=FE18652S |
| |
The complete ITCD candidate database can be
accessed at:
http://www.it-consultants-direct.co.uk/search.html |
| |
Please note that
you will need to
register with us before direct
contact with any candidate can be arranged. This is to protect
both the candidate's privacy and yours. Registration is free and
without obligation. We are registered under the data protection
act and the data we hold is for our own internal use only, we do
not share this data with anyone outside of ITCD unless required
to do so by law. |
| |
BIO DATA
|
1. PROPOSED
POSITION |
:
|
Civil Engineer |
|
2. NAME |
: |
|
|
3. DATE OF
BIRTH
|
: |
07th
November 1970 |
|
4.
NATIONALITY |
: |
Sri Lankan |
|
5. CONTACT
NOS. |
: |
|
|
6. EDUCATION
Jan. 1994 to May. 1998
Oct. 2003 to Apr. 2005 |
:
:
: |
Faculty of Engineering, University of
Moratuwa, Sri Lanka.
Bachelor of Science in Engineering,
1998.
Faculty of Hydro informatics, UNESCO-IHE
Delft, Netherlands.
Master of Science in Hydroinformatics,
2005.
|
|
7. OTHER
TRAINING |
: |
Followed an intensive training
programme on “Implementation of the National Involuntary
Resettlement Policy” conducted by Ministry of
Environment and Natural Resources and Ministry of
Lands, assisted by Asian Development Bank and World Bank
|
|
8. LANGUAGE
& DEGREE OF PROFICIENCY
|
: |
English -
Excellent
Sinhala
- Native
|
|
9.
MEMBERSHIP OF PROFESSIONAL INSTITUTIONS
|
: |
Associate Member of the Institution
of Engineers, Sri Lanka.
Life Member of the Sri Lanka
Commission on Large Dams. |
|
10.
COUNTRIES OF WORK EXPERIENCE
|
: |
Sri Lanka,
|
|
11.
EMPLOYMENT RECORD
Mar. 1999 to date |
: |
[snip], SRI
LANKA
Apr. 2007 – to date
: Dam Engineer
(local engineer for Japanese
consulting Firm [snip]. TOKYO, JAPAN )
Overall construction supervision of
Dam across Kotmale Oya and the development of Head pond
area of [snip] Project .
|
|
|
|
Jan. 2006 – Mar. 2007
: Transmission Engineer
(local
engineer for Japanese consulting Firm [snip]. TOKYO,
JAPAN )
Overall construction supervision of
33kV Transmission Line of [snip] Project . |
|
|
|
May 2005 to Dec. 2006
: Resident Engineer
Overall construction supervision of
Railway Bridge construction in Seeduwa and Ja-Ela under
the construction and replacement of railway bridges
project.
|
|
|
Oct. 2003 to
Apr. 2005 : Post
gradate studies
UNESCO-IHE,
Delft, Netherlands.
|
|
|
Nov. 2002 to Oct. 2003
: Civil Shift
Engineer,
Overall
construction supervision of Diversion Facilities of
Kukule Ganga Hydro Power Project.
Jul. 2001 to Nov. 2002
: Civil Engineer/ Engineering
Surveyor,
[snip] Project
Civil Engineer,
Biyagama Waste Water Pond
Sep. 2000 to Jul. 2001
: Civil Engineer,
Jul. 2000 to Sep. 2000
: Civil Engineer/ Engineering
Surveyor,
Water Resources Planning Unit
Bambarabatuwa Oya Mini Hydro Power
Project
|
May 1998 to Feb.
1999
|
: |
Kamburupitya – Hakmana Road
Improvement Project
|
12. DETAILED TASKS ASSIGNED
Apr. 2007 – To
date
|
:
: |
Engaged in preparation of
construction drawings, preparation of mass haul diagrams
for excavation works, conducting progress meetings and
overall construction supervision of diversion facilities
and the dam construction.
Project consist of
-
35.0m high and 180.0m long dam
-
13.0 km long head race tunnel
-
300.0 m long diversion tunnel
|
Jan. 2006 – Mar.
2007
|
|
Engaged in overall construction
supervision and contract Administration of 33kV
Transmission lines namely
·
21km 33kV Lynx
conductor double circuit tower line from Nuwara Eliya
Grid Substation to Niyamgamdora to provide supply to
switch yard area and adit 2 area.
·
12km 33kV Lynx
conductor double circuit tower line from Henfold via
Lindula Gantry to Talawakelle to provide supply to the
Talawakelle intake dam area.
|
May 2005 to Dec.
2006
|
|
Resident Engineer, Construction and
Replacement of Railway Bridges Project
Engaged in Construction supervision
and Contract Administration of Railway Bridge
construction in Seeduwa and Ja-Ela, includes
-
Construction of Middle pier and
Two abutments in Seeduwa
-
Fabrication and Installation of
Steel Bridge in Seeduwa
-
Construction of Two abutments in
Ja-Ela
|
Nov. 2002 to
Oct. 2003
|
|
|
Jul. 2001 to Nov.
2002
|
: |
|
Sep. 2000 to Jul.
2001
|
: |
|
|
Mar. 1999 to Jul. 2000 |
: |
|
|
May 1998 to Mar. 1999 |
: |
The project is to construct a road in
Kamburupitiya. The work includes the setting out of the
road, preparation of work schedules, labour handling,
material handling, preparation of monthly invoices. |
|
13.
CERTIFICATION |
: |
I, the undersigned, certify that, to
the best of my knowledge and belief this CV correctly
describes myself, my qualifications and my experience. I
understand that any wilful mis-statement described
herein may lead to my disqualification or dismissal, if
selected. I am a full-time employee of CECB and this
firm has employed me continuously up to date.
Signature :
........................... Date : 03/09/2007 |
|
| |
| |
| |
| |
© 2004, 2007 Copyright ITCD Group Ltd. All Rights Reserved. |
|
|