The following profile is a candidate from ITCD Group "ITCD".
http://www.it-consultants-direct.co.uk/
  This candidate can be contacted via the following link:
mailto:candidates@itcd-group.co.uk?Subject=FE18652S
  The complete ITCD candidate database can be accessed at:
http://www.it-consultants-direct.co.uk/search.html
  Please note that you will need to register with us before direct contact with any candidate can be arranged. This is to protect both the candidate's privacy and yours. Registration is free and without obligation. We are registered under the data protection act and the data we hold is for our own internal use only, we do not share this data with anyone outside of ITCD unless required to do so by law.
 

BIO DATA

 

1. PROPOSED  POSITION

:

 

Civil Engineer

2. NAME

:

 

3. DATE  OF  BIRTH

 

:

07th November 1970

4. NATIONALITY

:

Sri  Lankan 

5. CONTACT NOS.

:

 

6. EDUCATION

              Jan. 1994 to May. 1998

  

             Oct. 2003 to Apr. 2005

:

 

:

 

 

:

  

Faculty of Engineering, University of Moratuwa, Sri Lanka.

Bachelor of Science in Engineering, 1998. 

Faculty of Hydro informatics, UNESCO-IHE Delft, Netherlands.

Master of Science in Hydroinformatics, 2005.

 

7. OTHER TRAINING

:

Followed an intensive training programme on “Implementation of the National Involuntary Resettlement Policy” conducted by Ministry of Environment and Natural Resources and Ministry of      Lands, assisted by Asian Development Bank and World Bank

 

8. LANGUAGE  &  DEGREE  OF  PROFICIENCY

 

:

English  -          Excellent

Sinhala   -         Native         

 

9. MEMBERSHIP  OF  PROFESSIONAL  INSTITUTIONS

 

:

Associate Member of the Institution of Engineers, Sri Lanka.

Life Member of the Sri Lanka Commission on Large Dams.

10. COUNTRIES  OF  WORK  EXPERIENCE

 

:

Sri Lanka,

 

11. EMPLOYMENT  RECORD

                 Mar. 1999 to date

 

 

:

  

[snip], SRI  LANKA 

Apr. 2007 – to date               :   Dam Engineer

                                                 (local engineer for Japanese consulting Firm [snip]. TOKYO, JAPAN )  

Overall construction supervision of Dam across Kotmale Oya and the development of Head pond area of [snip] Project .

 

 

 

Jan. 2006 – Mar. 2007        :   Transmission Engineer

                                                 (local engineer for Japanese consulting Firm [snip]. TOKYO, JAPAN )  

Overall construction supervision of 33kV Transmission Line of [snip] Project .

 

 

 

May 2005 to Dec. 2006       :   Resident Engineer 

Overall construction supervision of Railway Bridge construction in Seeduwa and Ja-Ela under the construction and replacement of railway bridges project.

                                                                                    

               

 

Oct. 2003 to Apr. 2005        :  Post gradate studies  

                                               UNESCO-IHE, Delft, Netherlands.

 

 

               

 

Nov. 2002 to Oct. 2003     :     Civil Shift Engineer, 

                                                 Overall construction supervision of Diversion Facilities of Kukule Ganga Hydro Power Project. 

Jul. 2001 to Nov. 2002      :     Civil Engineer/ Engineering Surveyor,

[snip] Project 

Civil Engineer,

Biyagama Waste Water Pond 

Sep. 2000 to Jul. 2001      :     Civil Engineer,

Integrated Urban Development Project, Modarawila. 

Jul. 2000 to Sep. 2000      :     Civil Engineer/ Engineering Surveyor,

                                                      Water Resources Planning Unit

Mar. 1999 to Jul. 2000     :     Resident Engineer, 

Bambarabatuwa Oya Mini Hydro Power Project

 

                May 1998 to Feb. 1999

:

CONSULTING ENGINEERS AND CONTRACTORS, (CEC)

SRI LANKA. 

                                              :     Site Engineer, 

Kamburupitya – Hakmana Road Improvement Project

 

 

12. DETAILED TASKS ASSIGNED

 

                Apr. 2007 – To date

:

 

:

 

 

Dam Engineer, [snip] Project 

Engaged in preparation of construction drawings, preparation of mass haul diagrams for excavation works, conducting progress meetings and overall construction supervision of diversion facilities and the dam construction. 

Project consist of 

  • 35.0m high and 180.0m long dam
  • 13.0 km long head race tunnel
  • 300.0 m long diversion tunnel

 

             Jan. 2006 – Mar. 2007

 

Transmission Engineer, [snip] Project 

Engaged in overall construction supervision and contract Administration of 33kV Transmission lines namely 

·         21km 33kV Lynx conductor double circuit tower line from Nuwara Eliya Grid Substation to Niyamgamdora to provide supply to switch yard area and adit 2 area. 

·         12km 33kV Lynx conductor double circuit tower line from Henfold via Lindula Gantry to Talawakelle to provide supply to the Talawakelle intake dam area.

 

              May 2005 to Dec. 2006

 

Resident Engineer, Construction and Replacement of Railway Bridges Project 

Engaged in Construction supervision and Contract Administration of Railway Bridge construction in Seeduwa and Ja-Ela, includes 

  • Construction of Middle pier and Two abutments in Seeduwa
  • Fabrication and Installation of Steel Bridge in Seeduwa
  • Construction of Two abutments in Ja-Ela

 

              Nov. 2002 to Oct. 2003

 

Civil Shift Engineer, [snip]  Project 

Engaged in Construction Supervision and Contract Administration of diversion facilities, includes 

·         110 m long diversion weir with 4 Nos. spillway gates.

·         90 m long sand trap and tunnel intake structure.

·         Tunnel-intake structure.

·         Head Pond Development.

 

             Jul. 2001 to Nov. 2002

:

Civil Engineer/Engineering Surveyor, [snip] Project                    

 This project is to construct a dam across Kotmala Oya and a powerhouse to generate electricity with a capacity of 150 Mw. The work included the surveying of resettlement areas, blocking out of available land for resettlement, and prepare the layout plans.                                                  

Civil Engineer, Construction of   Wastewater Storage Pond                 

Biyagama Export Processing Zone 

The project intends to construct a wastewater storage pond to purify the wastewater of Biyagama Export Processing Zone before releasing to the Kelani River. The work included the preparation of BOQ, engineer's estimate and the tender document. Construction supervision is also carried out

 

 

             Sep. 2000 to Jul. 2001

:

Civil Engineer, Integrated Urban Development Project, Modarawila 

The Project comprises of constructing a road network for the Modarawila industrial zone. Setting out of the road with the contractor, construction supervision, preparation of payment certificates were the tasks handled.

 

             Mar. 1999 to Jul. 2000

:

Resident Engineer, Bambarabatuwa Oya Mini Hydropower Project 

The project is to generate electricity by means of constructing a weir, power canal, forebay, three penstocks and a powerhouse. The work covered construction supervision, checking the monthly bills, certifying the same and preparing the rates for variation orders as well as to other disputed items.

 

             May 1998 to Mar. 1999

:

Site Engineer, Southern Province Road Development Road Project  Kamburupitiya 

The project is to construct a road in Kamburupitiya. The work includes the setting out of the road, preparation of work schedules, labour handling, material handling, preparation of monthly invoices.

13. CERTIFICATION

:

I, the undersigned, certify that, to the best of my knowledge and belief this CV correctly describes myself, my qualifications and my experience. I understand that any wilful mis-statement described herein may lead to my disqualification or dismissal, if selected. I am a full-time employee of CECB and this firm has employed me continuously up to date. 

 

Signature  : ...........................     Date : 03/09/2007

 

 
 
 
© 2004, 2007 Copyright ITCD Group Ltd. All Rights Reserved.