PROFILE/ RELEVANT ACHIEVEMENT
Over 12 years of
continuous experience in the following areas; Fabrication &
Installation of Steel Structures, Water rehabilitation & Pipe
laying, Project Planning & Scheduling, Reporting,
Tender/proposal Preparation, Costing/Estimation, Mechanical
Equipment layout & Installation, Project Control & Management
using applicable Software.
EDUCATIONAL DETAILS:
University of Ilorin,
Nigeria
(1987 -1992)
Bachelor of Engineering (Mechanical) –B.Eng
Imade College Cwo, Ondo
State, Nigeria
(1982 - 1987)
West
African School Certificate
OTHER
SKILLS, EDUCATION AND ABILITIES
COMPUTER LITERACY:
Microsoft Excel, Microsoft Word, Microsoft Visio, Corel graphic
suite 11, Auto Cad,
Microsoft Project, & Primavera 3.0/5.0 (Project Planner) etc.
COURSES ATTENDED (Post College)
·
Quality Assurance System (ISO 9000 Standard)
·
HSE
management & Safety Awareness
·
Survival at Sea (SAS)
·
Helicopter Underwater Escape Techniques (HUET)
·
Risk
Awareness & Prevention
·
Contract Administration & Project Mgt –in house
·
Basic
Project Financing –In house
·
Sub
sea Technology (Diploma)
PROFESSIONAL MEMBERSHIPS
* Corporate Member Nigerian Society of Engineers
(10,115)
* Council of Regulation of Engineering Practice in Nigeria
(COREN) – Registration in Progress –Receipt No. 059898
* American Society of Mechanical Engineers (ASME –
9266990)
EMPLOYMENT DETAILS
[snip], ABUJA -
Product:
Engineers, Consultants and Project managers.
Project:
EPCM of a Petrochemical Plant to be sited in Lagos
Position:
Snr. Planning Engineer
Period:
September 2005 – till date
Responsibilities
·
Response to RFTs which includes; Site visit/ survey, QA/QC/HSE
requirements, work methodology/ project execution philosophy,
planning, commercial clarification meeting etc.
·
Preparation of project schedule, manpower, and quantity
progress curves and performance report
·
Determination of critical path activities for work discipline
and monitor schedule deviations and propose work around solution
·
Development of all planning and scheduling tools to be used in
control, monitoring and reporting of project status
·
Project costing & control.
·
Prepare scope of works & estimates for Request For Quotation
·
Develop specification & purchase requisitions for projects
equipment/materials
·
Project review/ progress meetings
·
Contract Reconciliation
·
Provide technical support to field Engineers & any other
engineering documentation.
[snip], PORT HARCOURT ( France)
Product:
Mechanical construction & Maintenance services for Oil & Gas
industries.
Project:
Major
Contractor to EPNL
Position:
Project /Proposal Engineer.
Period:
April 2004 –August 2005
Responsibilities
·
Reviewing Tender documents from Client and determining the exact
work scope.
·
Response to Technical documents (preparation of technical and
commercial proposals) which
includes; QA/QC/HSE requirements, work methodology, Planning,
Costing/Estimation, seeking management approval on prepared
tenders, Commercial clarification meeting etc.
·
Determination of procurement from scope of supply and reviewing
of suppliers’ quotations.
·
Development of work planning, manpower histogram, scheduling and
cost estimate for tenders and
awarded projects.
·
Development of project execution plans and progress
monitoring/evaluation reports for ongoing
projects (daily, weekly & monthly).
·
Determination of tasks sequence with the concerned departments.
·
Preparation of in-house estimates and costing of additional
works and variations
·
Review of Subcontractors' work procedures and quotations.
·
Follow-up of submitted Tenders & maintain Tender status
register.
·
Coordination of entire work activities both onshore & offshore
location & As-built documentation.
[snip] Product:
Engineering, Procurement, and Installation & Commissioning
Project:
Riser Repair Project & FMS contract for Exxon Mobil
Position:
Head Engineering
Period:
Oct' 2003 -April 2004
Responsibilities
·
Co-ordination of the preliminary surveys I inspection on
the risers to ascertain the integrity.
·
Development of specific work procedures for each riser repair,
which shall include survey reports, work execution plans, work
schedules, material take off lists, anchor patterns for the
construction vessel, drawings, calculations etc.
·
Review and approve design drawings and other technical documents
to ensure compliance with applicable project & contract
requirements.
·
Coordinate the activities of the Project/ Offshore Engineers.
·
Review of Subcontractors' work procedures
·
Implementation of the progress monitoring system for ongoing
project
·
Ensuring that Management of Change on project design is
performed according to established procedure
·
Provision of any required project engineering change in work
scope and as-built documentation
[snip]
Product:
Engineering, Procurement, and Installation & Commissioning
Project:
Riser Repair Project & FMS contract for Exxon-Mobil
Position:
Planning Engineer
Period:
Aug.'2001-0ct' 2003
Responsibilities
·
Planning and Scheduling Project activities (task definition,
duration and resources
allocation, e.t.c).
·
Preparation of Man-Power Histogram, Man-hour bar chart, S-Curve
& Work Breakdown Structure.
·
Progress monitoring, controlling and tracking of cost, duration
& resources in reference to baseline
(budget)
plan.
·
Preparation of Progress Reports. (Daily, weekly & monthly) &
Daily task scheduling
[snip]
(NIS.
ISO 9001 - 1994 Standard Certified)
Project:
National water Rehabilitation Project (NWRP) in 4 Southern
States of Nigeria
Position:
Project Mechanical Engineer
Period:
Dec.'
98 - Aug.'2001
Responsibilities
·
Preparation of Equipment and Materials Schedule required for
project execution.
·
Preparation of project progress report and Interim Payment
Certificates.
·
Contract reconciliation with clients/consultants and
sub-contractors
·
Preparation of Installation procedures and working drawings for
mechanical works.
1.
Pumps repairs and Installation
2.
Refurbishment of Old generators
3.
Construction of Davit Hoist
4.
Construction and installation of water aeration system
5.
Laying of ductile Iron pipes (4” – 12”) with associated
fitting
6.
Repair of concrete reservoirs.
7.
Mechanical Head works, etc.
·
Training of water board personnel on handling, operation and
maintenance of mechanical
equipment installed under this scheme for optimum utilization
[snip] IBADAN
Position Held:
Works
Engineer
Period:
June'
95- Dec'98
Responsibilities
Coordinating company's activities this includes; Steel structure
design, General Fabrication/ Constructions, Sandblasting
services, Facility Maintenance and Project Management.
[snip], IBADAN, OYO STATE
Product:
Industrial Engineering, Manufacturing and Consultancy Services
Position Held:
Project Engineer
Period:
April' 94- June' 95
Responsibilities
·
Products Development.
·
Preparation of working drawings and Supervision of maintenance
team.
·
Designing, Production and Replacement of Spare Parts for
Industrial Machines.
·
Factory layout and Equipment installation & maintenance
services.