| |
Name
:
Date of Birth :
September 14, 1965
Telephone :
Email :
Key Qualifications
Senior Electrical Engineer
offering 20 years of professional experience as follows: -
-
Managing the project life cycle starting from initiation,
planning, up to close out the project for the Utility,
Development of infrastructure and Residential buildings
projects.
-
Managing the material plan acquisition for the
forecasting projects
-
Leading the engineering part for the project including
the power distribution & generation system with all required
electrical equipments, cables, transmission lines as IEC
Standard or the building works as IEE Regulation for the
power circuits and internal wiring system.
-
Coordinating between the utility procedures and
contractor/consultant.
-
Conducting effective negotiations and estimation
techniques with various subcontractors.
-
Detailed experience in routine and preventive maintenance
for the electrical equipments of the steam power plant up to
315MW
-
Design and development of power distribution and lighting
system for the building projects.
-
Preparing the Technical documents, Scope of Work and BOQ
in the tendering stage.
-
Using MAXIMO 5.2 application to follow up the material
required in the stock and raise the Material Request, Work Order
and Contract Request attaching the contract document as the
Technical Specifications, Scope of Work, BOQ, Drawings …etc.
-
Experts in quality control and final inspection
management for LV, MV & HV switchgear up to 72KV.
-
Attending the required type test or routine test for the
MV/ LV cables and equipments with KIMA representative.
-
Safeguarding ISO 9001 requirements.
Education/Certifications
-
B.Sc.
in Electrical Eng. Specialization: “Power” 1987.
-
Post
Graduation in the
electrical Generation and Distribution
1992.
Training Courses
- Management Courses
-
Project Management as PMI
requirements
– PMBOK – 40Hrs Feb. 2007
-
Time, self and stress management – Career Development
Center – Aug. 1994
-
Managerial report writing and presentation skills –
Career Development Center – Dec. 1995
-
Supervisory and leadership skills – The German Mangement
Institute – Oct. 1997
-
Primavera enterprise P3e – Codesign Center – Sep.2002
-
Oracle enterprise asset management seminar – Oracle Oct.
2002.
-
Technical
Courses
-
Operation of Shoubrah el Khiema power plant “Bechtel Co.,
Cairo 1989”
-
Transformer test and assembly – Egyptian Electrical
Authority “EEA” – 1991
-
Motor control center – Egyptian Electrical Authority
“EEA” – 1992
-
Design, operation and maintenance of the electrical
distribution system – Hegazy Ind. Service “HIS” – Oct. 1994
-
All tests required for the high voltage equipment –
Schneider Egypt – 1996
- Quality Courses
1.
Think statistically for quality improved – Hegazy Ind.
Service “HIS” – Mar.1995
2.
Total quality management – Total International Expertise
Co. – “TOTALITY” – Mar. 1995
3.
Quality improvement tools and statistically – American
University Cairo – Oct. 1996
4.
Internal quality system auditing and ISO 9001 – American
University Cairo – Nov. 1996
5.
Quality control test and procedures - Schneider Electric
France – Jul. 1997
- Others
-
Safety and loss
control – Hegazy Ind. Service “HIS” – Jul. 1995
Computer Skills
-
Microsoft Office.
-
Primavera Enterprise P3e
-
Microsoft Project
-
MAXIMO 5.2 Application
-
Lighting System software
-
CYME Software for short circuit calculation and system
analysis
Work Experiences
1. [snip]
Dec.
2006 – Present
Project Management
Senior Electrical Engineer
to manage all activities related for the electrical power
distribution to develop the infrastructure and MEP projects,
problem solving, review and approve the electrical design, load
calculations, load phasing and distribution plan. Preparing of
tender documents, technical evaluation for bidders and awarding
project to the successful bidder.
-
To manage all activities for the project life cycle to
construct 2 nos. of the power distribution S/Ss 132/11KV – 120MW
-
Coordinate with DEWA the required load phasing and
distribution plan for the remaining 7 nos. of the power
distribution S/Ss 132/11KV – 120 MW
-
To manage and coordinate with DEWA construct more than
200 nos. of 11/0.4KV substations
-
Technical support for 132, 11 and 0.4KV cables work
-
Sharing with the
required design review for MEP - electrical part.
-
The electrical part of MEP works for different
residential projects
2. [snip]. (UAE)
Mar. 2003 – Nov. 2006
Projects Division
Senior Project engineer
to manage multiple projects concurrently with interfacing with
all details, problem solving and follow through capabilities,
developed infrastructure projects as per strategic plan for Abu
Dhabi Government, including the preparing of tender documents,
technical evaluation for bidders, awarding project to the
successful bidder, material submittal evaluation, material
prequalification as [snip] technical specifications,
coordinating for the progressive elaboration of [snip]
specifications.
Tasks:
-
Initiation
of project charter including
feasibility study and business need justification.
-
Planning
for the project processes,
developed work breakdown structure, schedule, cost
estimation, quality plan, communication plan and risk
management plan.
-
Execution
for project activities,
implementing of the project plan, material evaluation,
supervising the daily activities by managing teams of
consultants, inspectors and contractors.
-
Controlling
of project day-to-day
activities to assure compliance with the project management
plan, quality control and progressive scope verification.
-
Controlling
of project day-to-day
activities to assure compliance with the project management
plan, quality control and progressive scope verification.
-
Closing
out of project and issuance
of provisional acceptance certificate, follow up the snag
list, material reconciliation and issuance final acceptance
certificate.
-
Following the HSE roles
through project execution process.
-
Manage the progress meeting
with the consultants and the contractors.
-
Technical Support of the
Electrical Projects Dept. for all technical issue of
projects.
-
Preparing Tender Documents
for selection of the consultant and the contractor.
-
Evaluate and review the
bidders technical bid of the consultant and contractor.
-
Evaluate the material
submittals during the project execution.
-
Attending Factory Acceptance
Test (FAT) for the project different electrical equipments
including LV and MV cables
-
Manage the material plan
acquisition for all running projects or tenders.
-
Using MAXIMO 5.2 application
to follow up the material required in the stock and raise
the Material Request, Work Order and Contract Request
attaching the contract document as the Technical
Specifications, Scope of Work, BOQ, Drawings …etc.
-
Department coordinator for
the progressive elaboration of [snip] Technical
Specifications.
-
Member of the
prequalification committee for the new manufacturers and
attending the required type test as the prequalification
procedures.
Projects Reference:-
-
Developing the Power Network
System at Ghuzlan Island with 33KV OHL, 33/11 Primary S/S
GIS switchgear, 2x20MVA 33/11KV Transformer – 18 months with
M/s. Energo as consultant.
-
Developing the Power Network
System at Power Complex in Abu Dhabi international Airport
including SCADA system and the Civil Aviation works – 24
months with M/s. PB Power as consultant.
-
Reinforcement ADDC Network
through load transfer projects to new Primary S/Ss as
33/11KV S/S M15 in Zayed town, Al Raha Beach Primary and new
Marina Mall S/S – 12 months with M/s. Mott Mc Donald as
consultant.
-
Power Supply for the
developing of the new Cornich road (Municipality contracts
2015 & 2016) – 12 months with M/s. Deleuw Cather,
International Ltd. as consultant.
-
Developing the Street
Lighting network for Al Salam road – 8 months.
-
Power Network
Service/Customer Connections in Abu Dhabi City – 15 months
-
Rehabilitation, Preventive
and Maintenance for 33-11KV OHL in the Western Region – 24
months
3. [snip] for Manufacturing and
Industrial Projects Feb. 2000 – Mar. 2003
Projects Division
Senior Project engineer
in electrical department for Engineering and contracts
management of the electrical works in different stages, starting
from the preparation of the technical specs up to the handing
over to the client, under M/s Faculty of engineering – Cairo
University as consultant
Tasks:
-
Conducted effective
negotiations and estimation techniques with various
subcontractors.
-
Prepared the technical and
commercial sections of tenders.
-
Prepared B.O.Q. and the
price analysis for the electrical work of the above
mentioned projects
-
Assisted in the drafting
contracts of various electrical subcontractors.
-
Cooperated with [snip] (EEA)
in tendering and contracting for the main substation 66/6.3
KV – 4 Feeders – 25MVA for each – double bus bar.
-
Attended the energizing and
initial handing over with “EEA” for 66/6.3 KV S/S
-
Checked all the electrical
drawings and technical specs. Submitted for approval and
performed the modifications or changes (if required)
following IEC and BS International standards.
-
Reviewed and approved the
invoices submitted by the electrical subcontractors.
-
Used primavera enterprise
P3e and MS Project to perform planning (including tasks,
resources and cost) for the company’s electrical projects.
Projects Reference: -
-
Sinai Cement Grey factory, Egypt – 18 months with budget 200
millions USD.
-
Sinai Cement White factory, Egypt – 12 months with budget
100 millions USD.
-
LNG Dammeitta plant, Egypt.
-
Soda Ash factory, Alexandria, Egypt.
-
Multi story administrative building for food factory,
Alexandria, Egypt.
4.
[snip], Equipment
division Jul. 1993 –
Jan. 2000
Quality Control and Inspection Department
Final Quality inspection manager
Managing the inspector tem to perform the inspection procedures
and processes according to IEC and Schneider standards, to reach
customer satisfaction.
Tasks:
-
Inspecting and testing all
Schneider Electric equipment such as the Low Voltage, Medium
Voltage and high voltage up to 72 KV.
-
Involving and following-up
on the production plan and the in-process inspection during
the manufacturing process.
-
Performing the IEC and
Schneider standard guide for the inspection procedures.
-
Developing and updating the
inspection procedures.
-
Safeguarded ISO 9001
requirements.
-
Carrying out the customer
site inspection and trouble solution work.
-
Performing the customer
training on the site for the protection or control
equipment.
§
Technical Office & Design Department
Design Engineer
to design the required switchgear (Medium Voltage or Low
Voltage) according to IEC standard concerning the customer
requirements.
Tasks:
1.
Recommended optimal means to reduce equipment and
productivity cost.
2.
Responsible for the contracts progress during the
production cycle.
3.
Ensured that customer requirements are met with IEC
standard and the customer specifications and deliveries made on
schedule.
4.
Performed the short circuit study and relay coordination
for low or medium voltage networks through CYME software
5. [snip]
Dec.
1988 – Jun. 1993
§
Shoubrah el Khiema steam power plant 4 unitsx315MW – Cairo
Electrical Maintenance Engineer
to Maintain the electrical equipment inside the power plant
Tasks:
1.
Carrying out the preventive and routine maintenance
according to the manufacturing manual.
2.
Reporting for the department manager for the required
preventive or routine maintenance.
3.
Repairing and solving the technical problems or the
equipment’s parts nonconformity.
4.
Carrying out the overall maintenance procedures and
process according to the scheduling time.
5.
Maintaining the power plant equipments are as follows:
-
5.1
Medium voltage and Low voltage switchgear, motors, switch
board and the motor control center
5.2
The generator cooling system, light current equipment,
cranes and elevators.
§
[snip] – Cairo
Instructor Engineer
for technical courses as the transformer assembly and test &
motor control center.
6. [snip]. Co. “Korean Co.”
Nov. 1987
– Oct. 1988
Site Engineer
to supervise the installation of the electrical works for
Shoubrah el Khiema steam power plant unit 4, 315MW – Cairo,
under consultant M/s. Bechtel Co.
Tasks:
1.
Supervising the site installation work as the pulling of
different sizes and rating of cables, the electrical equipments
as the power step up transforme with rating 20/220 KV - 400MVA,
distribution transformers (Dry type and oil type transformers),
the LV and MV switchgears
2.
Followed-up the site activities as the project time
schedule.
3.
Issuing the progress report for the installation.
4.
Testing and commissioning of LV or MV switchgears.
|