The following profile is a candidate from ITCD Group "ITCD".
http://www.it-consultants-direct.co.uk/
  This candidate can be contacted via the following link:
mailto:candidates@itcd-group.co.uk?Subject=EL16722S
  The complete ITCD candidate database can be accessed at:
http://www.it-consultants-direct.co.uk/search.html
  Please note that you will need to register with us before direct contact with any candidate can be arranged. This is to protect both the candidate's privacy and yours. Registration is free and without obligation. We are registered under the data protection act and the data we hold is for our own internal use only, we do not share this data with anyone outside of ITCD unless required to do so by law.
 

 Name                             :                      

Date of Birth               : September 14, 1965

Telephone                   :

Email                           :

Key Qualifications 

Senior Electrical Engineer offering 20 years of professional experience as follows: - 

-          Managing the project life cycle starting from initiation, planning, up to close out the project for the Utility, Development of infrastructure and Residential buildings projects.

-          Managing the material plan acquisition for the forecasting projects

-          Leading the engineering part for the project including the power distribution & generation system with all required electrical equipments, cables, transmission lines as IEC Standard or the building works as IEE Regulation for the power circuits and internal wiring system.

-          Coordinating between the utility procedures and contractor/consultant.

-          Conducting effective negotiations and estimation techniques with various subcontractors.

-          Detailed experience in routine and preventive maintenance for the electrical equipments of the steam power plant up to 315MW

-          Design and development of power distribution and lighting system for the building projects.

-          Preparing the Technical documents, Scope of Work and BOQ in the tendering stage.

-          Using MAXIMO 5.2 application to follow up the material required in the stock and raise the Material Request, Work Order and Contract Request attaching the contract document as the Technical Specifications, Scope of Work, BOQ, Drawings …etc.

-          Experts in quality control and final inspection management for LV, MV & HV switchgear up to 72KV.

-          Attending the required type test or routine test for the MV/ LV cables and equipments with KIMA representative.

-          Safeguarding ISO 9001 requirements.

Education/Certifications 

-          B.Sc. in Electrical Eng. Specialization: “Power” 1987.

-          Post Graduation in the electrical Generation and Distribution 1992.

Training Courses 

- Management Courses

 

-          Project Management as PMI requirements – PMBOK – 40Hrs Feb. 2007

-          Time, self and stress management – Career Development Center  – Aug. 1994

-          Managerial report writing and presentation skills – Career Development Center  – Dec. 1995

-          Supervisory and leadership skills – The German Mangement Institute – Oct. 1997

-          Primavera enterprise P3e – Codesign Center – Sep.2002

-          Oracle enterprise asset management seminar – Oracle Oct. 2002.

 

-    Technical Courses

 

-          Operation of Shoubrah el Khiema power plant “Bechtel Co., Cairo 1989”

-          Transformer test and assembly – Egyptian Electrical Authority “EEA” – 1991

-          Motor control center – Egyptian Electrical Authority “EEA” – 1992

-          Design, operation and maintenance of the electrical distribution system – Hegazy Ind. Service “HIS” – Oct. 1994

-          All tests required for the high voltage equipment – Schneider Egypt – 1996

 

- Quality Courses

 

1.       Think statistically for quality improved – Hegazy Ind. Service “HIS” – Mar.1995

2.       Total quality management – Total International Expertise Co. – “TOTALITY” – Mar. 1995

3.       Quality improvement tools and statistically – American University Cairo – Oct. 1996

4.       Internal quality system auditing and ISO 9001 – American University Cairo – Nov. 1996

5.       Quality control test and procedures - Schneider Electric France – Jul. 1997

 

- Others

-          Safety and loss control – Hegazy Ind. Service “HIS” – Jul. 1995

Computer Skills 

-          Microsoft Office.

-          Primavera Enterprise P3e

-          Microsoft Project

-          MAXIMO 5.2 Application

-          Lighting System software

-          CYME Software for short circuit calculation and system analysis 

Work Experiences

 

1. [snip]                                                                                                             Dec. 2006 – Present

Project Management 

Senior Electrical Engineer to manage all activities related for the electrical power distribution to develop the infrastructure and MEP projects, problem solving, review and approve the electrical design, load calculations, load phasing and distribution plan. Preparing of tender documents, technical evaluation for bidders and awarding project to the successful bidder. 

-          To manage all activities for the project life cycle to construct 2 nos. of the power distribution S/Ss 132/11KV – 120MW

-          Coordinate with DEWA the required load phasing and distribution plan for the remaining 7 nos. of the power distribution S/Ss 132/11KV – 120 MW

-          To manage and coordinate with DEWA construct more than 200 nos. of 11/0.4KV substations

-          Technical support for 132, 11 and 0.4KV cables work

-          Sharing with the required design review for MEP - electrical part.

-          The electrical part of MEP works for different residential projects 

2. [snip]. (UAE)                                             Mar. 2003 – Nov. 2006

Projects Division 

Senior Project engineer to manage multiple projects concurrently with interfacing with all details, problem solving and follow through capabilities, developed infrastructure projects as per strategic plan for Abu Dhabi Government, including the preparing of tender documents, technical evaluation for bidders, awarding project to the successful bidder, material submittal evaluation, material prequalification as [snip] technical specifications, coordinating for the progressive elaboration  of [snip] specifications. 

Tasks:

  1. Initiation of project charter including feasibility study and business need justification.
  2. Planning for the project processes, developed work breakdown structure, schedule, cost estimation, quality plan, communication plan and risk management plan.
  3. Execution for project activities, implementing of the project plan, material evaluation, supervising the daily activities by managing teams of consultants, inspectors and contractors.
  4. Controlling of project day-to-day activities to assure compliance with the project management plan, quality control and progressive scope verification.
  5. Controlling of project day-to-day activities to assure compliance with the project management plan, quality control and progressive scope verification.
  6. Closing out of project and issuance of provisional acceptance certificate, follow up the snag list, material reconciliation and issuance final acceptance certificate.
  7. Following the HSE roles through  project execution process.
  8. Manage the progress meeting with the consultants and the contractors.
  9. Technical Support of the Electrical Projects Dept. for all technical issue of projects.
  10. Preparing Tender Documents for selection of the consultant and the contractor.
  11. Evaluate and review the bidders technical bid of the consultant and contractor.
  12. Evaluate the material submittals during the project execution.
  13. Attending Factory Acceptance Test (FAT) for the project different electrical equipments including LV and MV cables
  14. Manage the material plan acquisition for all running projects or tenders.
  15. Using MAXIMO 5.2 application to follow up the material required in the stock and raise the Material Request, Work Order and Contract Request attaching the contract document as the Technical Specifications, Scope of Work, BOQ, Drawings …etc.
  16. Department coordinator for the progressive elaboration of [snip] Technical Specifications.
  17. Member of the prequalification committee for the new manufacturers and attending the required type test as the prequalification procedures.

Projects Reference:- 

  1. Developing the Power Network System at Ghuzlan Island with 33KV OHL, 33/11 Primary S/S GIS switchgear, 2x20MVA 33/11KV Transformer – 18 months with M/s. Energo as consultant.
  2. Developing the Power Network System at Power Complex in Abu Dhabi international Airport including SCADA system and the Civil Aviation works – 24 months with M/s. PB Power as consultant.
  3. Reinforcement ADDC Network through load transfer projects to new Primary S/Ss as 33/11KV S/S M15 in Zayed town, Al Raha Beach Primary and new Marina Mall S/S – 12 months with M/s. Mott Mc Donald as consultant.
  4. Power Supply for the developing of the new Cornich road (Municipality contracts 2015 & 2016) – 12 months with M/s. Deleuw Cather, International Ltd. as consultant.
  5. Developing the Street Lighting network for Al Salam road – 8 months.
  6. Power Network Service/Customer Connections in Abu Dhabi City – 15 months
  7. Rehabilitation, Preventive and Maintenance for 33-11KV OHL in the Western Region – 24 months

 

3. [snip] for Manufacturing and Industrial Projects                   Feb. 2000 – Mar. 2003

Projects Division 

Senior Project engineer in electrical department for Engineering and contracts management of the electrical works in different stages, starting from the preparation of the technical specs up to the handing over to the client, under M/s Faculty of engineering – Cairo University as consultant

Tasks:

  1. Conducted effective negotiations and estimation techniques with various subcontractors.
  2. Prepared the technical and commercial sections of tenders.
  3. Prepared B.O.Q. and the price analysis for the electrical work of the above mentioned projects
  4. Assisted in the drafting contracts of various electrical subcontractors.
  5. Cooperated with [snip] (EEA) in tendering and contracting for the main substation 66/6.3 KV – 4 Feeders – 25MVA for each – double bus bar.
  6. Attended the energizing and initial handing over with “EEA” for 66/6.3 KV S/S
  7. Checked all the electrical drawings and technical specs. Submitted for approval and performed the modifications or changes (if required) following IEC and BS International standards.
  8. Reviewed and approved the invoices submitted by the electrical subcontractors.
  9. Used primavera enterprise P3e and MS Project to perform planning (including tasks, resources and cost) for the company’s electrical projects.

Projects Reference: - 

  1. Sinai Cement Grey factory, Egypt – 18 months with budget 200 millions USD.
  2. Sinai Cement White factory, Egypt – 12 months with budget 100 millions USD.
  3. LNG Dammeitta plant, Egypt.
  4. Soda Ash factory, Alexandria, Egypt.
  5. Multi story administrative building for food factory, Alexandria, Egypt.

 

4. [snip], Equipment division                                          Jul. 1993 – Jan. 2000

Quality Control and Inspection Department

 

Final Quality inspection manager Managing the inspector tem to perform the inspection procedures and processes according to IEC and Schneider standards, to reach customer satisfaction.

 

Tasks:

  1. Inspecting and testing all Schneider Electric equipment such as the Low Voltage, Medium Voltage and high voltage up to 72 KV.
  2. Involving and following-up on the production plan and the in-process inspection during the manufacturing process.
  3. Performing the IEC and Schneider standard guide for the inspection procedures.
  4. Developing and updating the inspection procedures.
  5. Safeguarded ISO 9001 requirements.
  6. Carrying out the customer site inspection and trouble solution work.
  7. Performing the customer training on the site for the protection or control equipment.

 

§         Technical Office & Design Department

 

Design Engineer to design the required switchgear (Medium Voltage or Low Voltage) according to IEC standard concerning the customer requirements. 

Tasks:

1.       Recommended optimal means to reduce equipment and productivity cost.

2.       Responsible for the contracts progress during the production cycle.

3.       Ensured that customer requirements are met with IEC standard and the customer specifications and deliveries made on schedule.

4.       Performed the short circuit study and relay coordination for low or medium voltage networks through CYME software

 

5. [snip]                                                                 Dec. 1988 – Jun. 1993

§         Shoubrah el Khiema steam power plant 4 unitsx315MW – Cairo

 

 Electrical Maintenance Engineer to Maintain the electrical equipment inside the power plant

Tasks:

 

1.       Carrying out the preventive and routine maintenance according to the manufacturing manual.

2.       Reporting for the department manager for the required preventive or routine maintenance.

3.       Repairing and solving the technical problems or the equipment’s parts nonconformity.

4.       Carrying out the overall maintenance procedures and process according to the scheduling time.

5.       Maintaining the power plant equipments are as follows: -   

5.1   Medium voltage and Low voltage switchgear, motors, switch board and the motor control center

5.2   The generator cooling system, light current equipment, cranes and elevators.

 

§         [snip] – Cairo

 

Instructor Engineer for technical courses as the transformer assembly and test & motor control center.

 

6. [snip]. Co. “Korean Co.”                                                   Nov. 1987 – Oct. 1988

 

Site Engineer to supervise the installation of the electrical works for Shoubrah el Khiema steam power plant unit 4, 315MW – Cairo, under consultant M/s. Bechtel Co.

Tasks:

1.       Supervising the site installation work as the pulling of different sizes and rating of cables, the electrical equipments as the power step up transforme with rating 20/220 KV - 400MVA, distribution transformers (Dry type and oil type transformers), the LV and MV switchgears

2.       Followed-up the site activities as the project time schedule.

3.       Issuing the progress report for the installation.

4.       Testing and commissioning of LV or MV switchgears.

 
 
 
© 2004, 2007 Copyright ITCD Group Ltd. All Rights Reserved.