|
An IT Technical Project Manager with an exceptional record of
delivering successful IT Solutions on schedule and within budget
built upon expertise developed over 30 years in the industry.
Strong communication and management skills combined to provide a
platform for significant leadership and achievements.
Key Skills
·
Well organised, methodical and results oriented with proven
ability to implement standards.
·
Logical approach to problem solving and introducing procedures
and process that improve functionality.
·
Solid Management skills leading and motivating individuals to
maximize productivity, while forming cohesive team environments.
·
Exceptional communicator at technical and non-technical level
focusing on building strong client relationships.
-
Respond positively to challenges, adapting to any
environment in the U.K. or Overseas.
Technical Skills
Windows 2000/03 LAN/WAN, VSAT MPLS Desktops Win
2000/03, XP IT Technical Support
Novell 4.11 Wireless Networks MS
Office , Outlook 2000/03, Project Management
Unix AIX 5.3 Networking Client/Server MS
Exchange 2000/03 Disaster Recovery
Internet
Technology ERP (Mfg/Pro)
Risk Management
Active Directories
Data Warehousing IT Security
Desktop Policies.
Document imaging IT Training
Career
2004-2006
IT Project Manager Overseas in Ghana, Kenya, and
Indonesia.
1999-2004
IT Project Manager United Kingdom.
1995-1999
IT Operations Manager.
1980-1995
IT Operations Supervisor.
1975-1980
Data Processing Operator.
1969-1975 Shipping Clerk/Team Leader.
Education and Training.
Windows 2000 Administration and Network Fundamentals
MS Office 2000-3, XP (Word, Excel, PowerPoint). Novell 4.11 and
UNIX – Administration.
TCP/IP and Cisco Router 3500, 1600,800 and Cisco 3500 switch
Configuration.
Fluke Network Monitoring Tools – Lanmeter and OneTouch.
LAN and WAN Network Fundamentals. Xyplex – Network
Administration,
Gandalf - Terminal & Bridging. Network Cabling Fundamentals.
IBM RS6000, Series P5 – AIX Version 5 Installation and
Administration.
ICL/FUJITSU DRS6000 Installation and Administration. WANG VS100
Administration.
MFG/PRO – Production Systems Essentials – all Parts ERP
including Financials.
Coverdale – Project Management. Industrial Society – Management,
Time Management.
Disaster Recovery and Risk Management.
INVU – Document Management Installation and Support. Matrix
Impact XP Administration.
QCPROv5 – Installation and Support. Excalibur – Document Imaging
Administration.
7 CSE’s – Including :- Maths, English, Physics,
Personal
Driving Licence:- Full/Clean.
Languages:- Ukrainian (Fluent).
Employment History.
[snip] Indonesia
IT Technical Projects
Manager
April 2006 – October 2006.
Manufacturing Site Project to Improve IT Infrastructure and
Upgrade IT Manufacturing and Applications Systems to conform
with [snip] Group Strategy. Build New Computer Centre , Upgrade
LAN and WAN Infrastructure.
● IT Infrastructure /System Review completed including
recommendations and Scope of Work
which was approved by Managing Director. Agreed Budget and
Phase I & II to be completed.
● Constructed New Computer Room with Appropriate Environmental
Controls,
● HQ LAN active equipment changed to CISCO Switches and Routers
with Network Management.
● WAN Installation (Fibre/Mico Radio Link) 512k link between
Jakarta (HQ) and Tangerang
● Purchase New IBM Unix Server, Installation, Configuration and
upgrade to latest ERM System
MFG/Pro EB2.4 Existing IBM Unix Server moved to Tangerang
(Factory) to be used as Disaster
Backup Recovery System.
● Reorganise and upgrade all Windows Servers to Latest 2003
version, Applications, Shared File
& Print, SQL and MS Exchange Servers.
● Deploy DHCP, Active Directories and join Servers to the
Cussons Domain introducing
appropriate IT Security Policies.
● Introduced Help Desk, PC Desktop Lockdown, Procurement,
Operational, Backup & Recovery
Policies as dictated by Group IT Policies.
● Re-structured, recruited and trained IT Staff and provide
Interim IT Support.
● Instrumental in sourcing suitable 3rd Party
Maintenance and Service Providers , line with the
Groups requirements.
● Completed as scheduled and within budget.
[snip]. Kenya.
IT Technical Projects
Manager.
October 2005 – April 2006.
Manufacturing Site Project to Improve IT Infrastructure and
Upgrade IT Manufacturing and Application Systems, Upgrade LAN
and WAN Infrastructure.
● IT Infrastructure /System Review completed including
recommendations and Scope of Work
which was approved by Senior Management.
● Implemented System Access and Security Controls for IBM AIX
Unix and Windows 2003 Servers.
● Installed and Configured 2950 Cisco Switches and deployed DHCP.
● Introduced Storage Access and System Optimisation Process.
● Introduced IT Security, Backup and Recovery, Desktop and
Disaster Recovery Policies.
● Instrumental in sourcing suitable 3rd Party
Maintenance and Service Providers , line with the
Groups requirements.
● Assessed IT Staffing requirements and submitted
recommendations.
● Initiated Operational and Backup Procedures, Negotiated
Contracts for Maintenance Support,
provided training for IT Manager and IT Technical Support
for End Users.
● Provided Administrational and System Support for IBM AIX Unix,
Windows 2003 and MS
Exchange 2000 support.
● Completed as scheduled and within budget.
[snip]. Tema, Ghana. West Africa.
IT Technical Projects Manager
2004 – 2005.
Manufacturing Site Project – Complete Green Site Installation
with New IT Installation Infrastructure and Upgrade IT
Manufacturing and Application Systems to also include new
LAN/WAN Installation.
● Site Survey and Identified Suitable location for Computer
Room, provided power, lighting, air
conditioning, decoration, racking, suitable furniture , fire
extinguishing system, UPS’s for
Network and Computer hardware.
● Identified suitable Network Providers and Installed Local
Area Network on 3 Com Switching Solution.
● Installed IBM AIX Unix and Win2000 Servers.
● Connected Unix Server to the LAN, configure Servers ready for
Manufacturing Software
Installation. MFG/PRO EB2 with Progress as the preferred
database and provided IT Support
during the Implementation.
● Provided upgrade plan for Database migration from an NCR/Unix
platform to IBM /AIX
● Connected IBM Win2000 Server, deploy DHCP , Active
Directories and Install MS Exchange
2000 and provide an effective internal/and external e-mail
system with Internet Connectivity.
● Provided Administrational and System Support for IBM AIX
Unix, Windows 2000 and MS
Exchange 2000 support.
● Negotiate and Provide Suitable Service Provider for
Installation of a VSAT Satellite System
providing connectivity to the United Kingdom via Nigeria and
suitable VPN links to
Distribution Depots within Ghana.
● Provided a desktop policy based on Microsoft Application
Software. Initiated Operational and
Backup Procedures, Negotiated Contracts for Maintenance
Support, provided Training For IT
Manager and IT Technical Support for End Users.
● Assessed IT Staffing requirements and submitted
recommendations, interviewed ,recruited
and trained IT Support Staff.
[snip], Stockport, Cheshire
IT Technical Projects Manager
U.K. Production Sites, Warehouses and Distribution
Depots. 1999 – 2004.
Overall responsible for all [snip] Manufacturing Sites in the
United Kingdom at Nottingham, Salford and Ellesmere Port,
Warehouses at Bury and Farnworth also Distribution Centres in
Glasgow, Birmingham, Goole, Nottingham and Manchester. – Number
of Users Supported 200+.
Manufacturing Sites and Warehouse. – Upgrades.
2002 – 2004.
• LAN and WAN replaced at all Manufacturing Sites – Configured
Cisco Enterprise 3548, 24
Switches, Cisco 1600, 1700 and 801 Routers.
• Migrated from Novell 4.11 NDS to Windows 2000 introduction
Configured Servers and
introduced , DHCP, Active Directories, Terminal Services,
File Sharing and Network Printing.
• Replaced Compaq Prolinea 5000 Server with Compaq ML370,
DL380 Servers.
• Reconfigured all Desktop PC’s Win’95 to provide Terminal
Services .
• Installed and provided IT Support for Matrix ImpactXP Plant
Preventative Maintenance System
– Nottingham.
• Installed and provided IT Support for QCPROv5 Weights System
– Nottingham and Salford.
• Installed and provided IT Support for “FORMPAK”
Perfume/Fragrance System and INVU
Document Management Systems – Elesmere Port.
• Installed Wireless Network – RF Units provided by Teklogix
and ATMS Data Warehousing
System with integration links to the Main MFG/PRO Production
System.
Manufacturing Site and Warehouse - Installation.
2000 - 2002.
• LAN and WAN Network Installation using UTP Cat5 cabling with
Xyplex Active Components
and Gandalf Bridging.
• Installation of Compaq Prolinea 5000 Server with Novell 4.11
platform and configured NDS
providing File and Print Services. – Manufacturing Site Only.
• Deployed PC’s Win95 Desktop Policy with access to MFG/PRO
production System, MS Office
97 and MS Mail.
IT Technical Projects Manager, Head Office Stockport
1999 - 2000.
Overall Administrative, and responsibility for all IT Technical
Projects at Head Office and the IT Technical Support Team.
Providing all Operational Support for LAN,WAN Network
Installation and Support, Main Manufacturing and Desktop
Application Systems. Help Desk Support and IT Administration
Function. – Number of Users Supported 350+.
• LAN and WAN Network Installation using UTP Cat5 cabling with
Xyplex Active Components
and Gandalf Bridging. To Manufacturing Sites and Warehouses.
• Installation of 5 x Compaq Prolinea Servers with Novell
4.11 platform and configured NDS
providing File and Print Services.
• Deployed PC’s Win95 Desktop Policy with access to MFG/PRO
production System,
• Supported ICL/Fujitsu DS6000 Unix Servers running MFG/PRO
Main Production Systems.
• Supported IBM RS6000 AIX Unix Servers providing “Staffware”
workflow and “Excalibur”
document imaging Systems, Bacs, Payroll and Security Access
Systems.
• Y2000 Hardware/Network and Application Software Testing for
Compliance.
IT Operations
Manager.
1994 – 1999.
Overall
IT Operational responsibility for all IT Support heading a
small IT Technical Support Team.
Providing all Operational Support for LAN,WAN Network
Installation and Support, Main Manufacturing
Dumb Terminal Application Systems. Help Desk Support and IT
Administration Function. – Number of
Users Supported 350+. |